SHREE SIDHBALI ISPAT LTD.

Sector: Manufacturing (Industrial) • Location: Maharashtra, India

Source: India Investment Grid (IIG)

Project
Closed

Economic/Social Impact of the Project Shri Sidhbali Ispat Ltd. an integrated Steel Plant with Captive Power Plant having proposed capacity of 1 Million tone steel [0.3 million tone first phase with 20 MW CPP [12.8 MW CFBC + 7.2 MW WHR] already installed during 2010 and construction of second phase of 0.7 million tone steel and 35 MW Captive Power Plant is on. The total cost of project is Rs.1050 C

Project Information FAQ

Project Information

5 Q
The project “SHREE SIDHBALI ISPAT LTD.” is an infrastructure initiative in the Manufacturing (Industrial) sector, located in Maharashtra, India. Taiyo aggregates data on it from India Investment Grid (IIG).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Economic/Social Impact of the Project Shri Sidhbali Ispat Ltd. an integrated Steel Plant with Captive Power Plant having proposed capacity of 1 Million tone steel [0.3 million tone first phase with 20 MW CPP [12.8 MW CFBC + 7.2 MW WHR] already installed during 2010 and construction of second phase of 0.7 million tone steel and 35 MW Captive Power Plant is on. The total cost of project is Rs.1050 Crore [300 Crores in first phase already commissioned and work of second phase is going on] Captive Power Plant of 20 MW [12.8 MW CFBC and 7.2 MW WHR] was commissioned on 11.10.2010. SLC [Long Term] for linkage approved our case for issuing LOA for 12 MW in its meeting held on 18/01/2007. LOA was issued by WCL and stipulated milestones were achieved within the LOA period. On commissioning of plant [CPP] the capacity was slightly higher, which was accepted by Ministry of Coal in its order dated 5th Aug 2010. Inspite of approval by MOC the officials of WCL was not signing the FSA. The matter was placed in the review committee [SLC-L

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data