Shtip WPP

One of 961 projects Taiyo tracks in North Macedonia.

Source: European Bank for Reconstruction and Development (EBRD)

The Project consists of the development, construction, and operation of a greenfield 131 MW wind farm located in the municipality of Stip (eastern North Macedonia), approximately 75 km south-east of the capital, Skopje. The Project consists of 21 wind turbine generators, each with a nominal capacity of approximately 6-8 MW and related connection infrastructure (a 35/400 kV substation and a new 7 k

Status
Under Construction
Sector
Geothermal, Power Generation (CCGT), Power Transmission, Wind, Hydro, Solar, Water Supply and Storage, Raw Materials, Commercial, Road, Residential
Location
Macedonia
Updated
22 Jul 2026
Source
European Bank for Reconstruction and Development (EBRD)

ConstructChat

Ask ConstructChat about Shtip WPP

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “Shtip WPP” is an infrastructure initiative in the Geothermal sector, located in North Macedonia. Taiyo aggregates data on it from European Bank for Reconstruction and Development (EBRD).

Participants

Not available for this record.

Status

Original status

signed

Taiyo status

Under Construction

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The Project consists of the development, construction, and operation of a greenfield 131 MW wind farm located in the municipality of Stip (eastern North Macedonia), approximately 75 km south-east of the capital, Skopje. The Project consists of 21 wind turbine generators, each with a nominal capacity of approximately 6-8 MW and related connection infrastructure (a 35/400 kV substation and a new 7 km 400 kV overhead transmission line that will link the substation to the existing transmission network). This Project is the first phase out of three across the wider project area, with a secured combined connection capacity of up to 396 MW and an expected total of 54 wind turbines. The combined phases will install about 68 km of 35 kV buried cables along internal roads to connect the wind turbines to the 35/400 kV substation. The first phase will be developed by STP WIND DOOEL Skopje (the “Borrower”), which is a North Macedonian SPV fully-owned by Alcazar Energy Partners II SLP (SCSp) (the “Sponsor”). The Sponsor is a sustainable infrastructure fund, specialising in utility-scale renewable energy developments across emerging markets. The Project will support the country’s commitment to phase out coal by 2030 and increase the share of renewables in its energy mix. The Project also advances an inclusive transition by establishing a new green skills training initiative, developed jointly with the Borrower, supporting local workforce development. The following documents will be included in the ESIA Disclosure Package: • Non-Technical Summary (NTS) (available in English, Macedonian, and Turkish) • Environmental and Social Impact Assessment (ESIA) • Stakeholder Engagement Plan (SEP) • Environmental and Social Management and Monitoring Plan (ESMMP) Framework • Technical Appendices (English only) • Livelihood Restoration Plan (LRP) • Biodiversity Management Plan (BMP) • Environmental and Social Action Plan (ESAP) (English only) Download Zip package in English Download NTS in Turkish Download Zip package in Macedonian Public Consultation Report (PCR) Full ESIA documentation is available locally at: Alcazar Energy Partners Skopje Office, TGG Business Center, 2nd floor, Pirinska 29, 1000 Skopje, North Macedonia And Stip Wind Farm Community Liaison Office, Kej Maršal Tito 54-1, 2nd floor, Shtip, North Macedonia And EBRD Skopje Resident Office, Soravia Centre Skopje, 7th floor, Filip II Makedonski no. 3, 1000 Skopje, North Macedonia Telephone: +389 2 3297 800 And Client website: https://alcazarenergy.com/single-projects/stip-wind-farm/ Project website: http://www.stipwindfarm.mk Environmental or social enquiries Alcazar Energy Partners Skopje Office, TGG Business Center, 2nd floor, Pirinska 29, 1000 Skopje, North Macedonia Contact Person: Tanja Dimitrova Filkoska Telephone: +389 70247773 Email: tfilkoska@ALCAZARENERGY.COM And Stip Wind Farm Community Liaison Office, Kej Maršal Tito 54-1, 2nd floor, Shtip, North Macedonia Contact Person: Viktor Dimitrov Telephone: +389 71349995 Email: clostipwindfarm@alcazarenergy.com

Original sector

Energy

Location

Country

Macedonia

Source

Source

European Bank for Reconstruction and Development (EBRD)

URL

More Details

Record type

Project

Sector

Geothermal, Power Generation (CCGT), Power Transmission, Wind, Hydro, Solar, Water Supply and Storage, Raw Materials, Commercial, Road, Residential

Article published date

2026-06-15

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project