Shtip WPP
Sector: Geothermal • Location: North Macedonia
Source: European Bank for Reconstruction and Development (EBRD)
The Project consists of the development, construction, and operation of a greenfield 131 MW wind farm located in the municipality of Stip (eastern North Macedonia), approximately 75 km south-east of the capital, Skopje. The Project consists of 21 wind turbine generators, each with a nominal capacity of approximately 6-8 MW and related connection infrastructure (a 35/400 kV substation and a new 7 k
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | approved |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The Project consists of the development, construction, and operation of a greenfield 131 MW wind farm located in the municipality of Stip (eastern North Macedonia), approximately 75 km south-east of the capital, Skopje. The Project consists of 21 wind turbine generators, each with a nominal capacity of approximately 6-8 MW and related connection infrastructure (a 35/400 kV substation and a new 7 km 400 kV overhead transmission line that will link the substation to the existing transmission network). This Project is the first phase out of three across the wider project area, with a secured combined connection capacity of up to 396 MW and an expected total of 54 wind turbines. The combined phases will install about 68 km of 35 kV buried cables along internal roads to connect the wind turbines to the 35/400 kV substation. The first phase will be developed by STP WIND DOOEL Skopje (the “Borrower”), which is a North Macedonian SPV fully-owned by Alcazar Energy Partners II SLP (SCSp) (the “Sponsor”). The Sponsor is a sustainable infrastructure fund, specialising in utility-scale renewable energy developments across emerging markets. The Project will support the country’s commitment to phase out coal by 2030 and increase the share of renewables in its energy mix. The Project also advances an inclusive transition by establishing a new green skills training initiative, developed jointly with the Borrower, supporting local workforce development. The following documents will be included in the ESIA Disclosure Package: • Non-Technical Summary (NTS) (available in English, Macedonian, and Turkish) • Environmental and Social Impact Assessment (ESIA) • Stakeholder Engagement Plan (SEP) • Environmental and Social Management and Monitoring Plan (ESMMP) Framework • Technical Appendices (English only) • Livelihood Restoration Plan (LRP) • Biodiversity Management Plan (BMP) • Environmental and Social Action Plan (ESAP) (English only) Download Zip package in English Download NTS in Turkish Download Zip package in Macedonian Public Consultation Report (PCR) Full ESIA documentation is available locally at: Alcazar Energy Partners Skopje Office, TGG Business Center, 2nd floor, Pirinska 29, 1000 Skopje, North Macedonia And Stip Wind Farm Community Liaison Office, Kej Maršal Tito 54-1, 2nd floor, Shtip, North Macedonia And EBRD Skopje Resident Office, Soravia Centre Skopje, 7th floor, Filip II Makedonski no. 3, 1000 Skopje, North Macedonia Telephone: +389 2 3297 800 And Client website: https://alcazarenergy.com/single-projects/stip-wind-farm/ Project website: http://www.stipwindfarm.mk Environmental or social enquiries Alcazar Energy Partners Skopje Office, TGG Business Center, 2nd floor, Pirinska 29, 1000 Skopje, North Macedonia Contact Person: Tanja Dimitrova Filkoska Telephone: +389 70247773 Email: tfilkoska@ALCAZARENERGY.COM And Stip Wind Farm Community Liaison Office, Kej Maršal Tito 54-1, 2nd floor, Shtip, North Macedonia Contact Person: Viktor Dimitrov Telephone: +389 71349995 Email: clostipwindfarm@alcazarenergy.com |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
