logo
ProjectRepaying

Shuakhevi HPP

Repaying · Georgia

Source: European Bank for Reconstruction and Development (EBRD)

The EBRD is considering extending a senior loan to Adjaristsqali Georgia LLC (the "Borrower") of up to USD 89.9 million (EUR 66.2 million) for the financing of the development, construction and operation of Shuakhevi HPP, a hydroelectric power plant to be located on the Adjaristsqali river in south-western Georgia (the "Project"). Shuakhevi HPP will have an installed capacity of 187 MW with expect

Status
Under Construction
Sector
Power Generation (CCGT), Hydro, Forest Products and Packaging, Water Supply and Storage, Commercial, Road, Residential
Location
Georgia
Updated
22 Jul 2026
Source
European Bank for Reconstruction and Development (EBRD)

ConstructChat

Ask ConstructChat about Shuakhevi HPP

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Shuakhevi HPP” is an infrastructure initiative in the Power Generation (CCGT) sector, located in Georgia. Taiyo aggregates data on it from European Bank for Reconstruction and Development (EBRD).

Participants

Not available for this record.

Status

Original status

repaying

Taiyo status

Under Construction

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The EBRD is considering extending a senior loan to Adjaristsqali Georgia LLC (the "Borrower") of up to USD 89.9 million (EUR 66.2 million) for the financing of the development, construction and operation of Shuakhevi HPP, a hydroelectric power plant to be located on the Adjaristsqali river in south-western Georgia (the "Project"). Shuakhevi HPP will have an installed capacity of 187 MW with expected electricity output of 452 GWh. The plant is designed as a run-of-the-river plant with capacity for diurnal storage in two reservoirs, allowing Shuakhevi HPP to store water for up to 12 hours and sell electricity at peak demand times.

Original sector

Energy

Budget

Location

Country

Georgia

Source

Source

European Bank for Reconstruction and Development (EBRD)

URL

More Details

Record type

Project

Sector

Power Generation (CCGT), Hydro, Forest Products and Packaging, Water Supply and Storage, Commercial, Road, Residential

Article published date

2026-06-08

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project