logo

Shuwaikh RO Project

Sector: Hydro • Location: Kuwait

Source: Water Technology

Project
Closed

The Shuwaikh sea water reverse osmosis plant is located near the Shuwaikh Port in the Kingdom of Kuwait. Shuwaikh already has a water treatment plant of six million gallons a day capacity. Image courtesy of NordNordWest. The Shuwaikh RO project has the capacity to treat 136,000m3 of water a day to supply potable water to about 450,000 residents of Kuwait. Image courtesy of Cartam. ABSFIL supplied

Project Information FAQ

Project Information

4 Q
The project “Shuwaikh RO Project” is an infrastructure initiative in the Hydro sector, located in Kuwait. Taiyo aggregates data on it from Water Technology.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The Shuwaikh sea water reverse osmosis plant is located near the Shuwaikh Port in the Kingdom of Kuwait. Shuwaikh already has a water treatment plant of six million gallons a day capacity. Image courtesy of NordNordWest. The Shuwaikh RO project has the capacity to treat 136,000m3 of water a day to supply potable water to about 450,000 residents of Kuwait. Image courtesy of Cartam. ABSFIL supplied a Membrane Testing Unit with all necessary equipment and safety facilities for continuous automatic operation of the Shuwaikh RO desalination plant in Kuwait. The RO test system and cartridge filter are shown in the image. Image courtesy of ABSFIL. The Shuwaikh RO Project involves the construction of a sea water desalination plant in the Kingdom of Kuwait. It is the first desalination plant in Kuwait to use reverse osmosis (RO) technology for seawater treatment. The plant is located near Shuwaikh Port, Kuwait. Shuwaikh already has a water treatment plant of six million gallons a day capacity. It was built in 1954 along with a power plant. The existing plant consists of three boilers and three desalination units including recarbonation, demineralisation and water intake facilities. The plant uses multistage flashing technology. The new plant uses reverse osmosis with recarbonation system to treat sea water into potable water. It was completed by 2010 and is being operated by Doosan Heavy Industries & Construction. The operations and maintenance contract ends in 2013. The new sea water reverse osmosis (SWRO) plant was proposed by the Kuwaiti Ministry of Electricity and Water (MEW) as part of the Ministry’s measures to ensure a sustained supply of potable water for the communities living in Kuwait. Sustainable supply of water has been a growing concern for the country. The Shuwaikh SWRO plant has a UF permeate capacity of 350MLD. With an RO installed capacity of 136,000m3/day (36 million US gallons a day), the plant supplies drinking water to about 450,000 people residing in the city of Kuwait. The membrane technology for the plant was provided by X-Flow, part of the Pentair Group. Doosan placed an order with Pentair X-Flow in 2008 for the supply of Pentair Seaguard Ultra Filtration (UF) membranes and Pentair Seaguard skids for the plant. Energy Recovery Incorporated (ERI), a US-based company, supplied PX Pressure Exchanger technology for the plant. The technology reduces the power consumption of the plant. ERI supplied 187 PX-260 energy recovery devices, which save 12.7MW of power in total. The engineering, procurement and construction contract (EPC) of the plant was awarded to Doosan Heavy Industries & Construction. It won the project bid for KWD88m (approximately $320m) in March 2008. It was the second largest RO plant undertaken by Doosan at that time. The basic and detailed design engineering services for the project were provided by Doosan Hydro Technology, a wholly-owned subsidiary of Doosan. The tendering process to award the EPC contract was initiated in 2006. Doosan was the only bidder for the project when the tender was filed in September 2006. The project had to be retendered as the Kuwaiti law required at least two bidders to award a tender. Doosan won the project against Metito during the retender process. Doosan appointed Bronzia Projects General Trading & Contracting for the erection works involved in the project. The scope of work included erection of transformers, busducts, MV/LV switchgears, cable laying and termination, instrumentation, plumbing works and mechanical equipment. It also included erection of structural steel and piping. The project involved more than 5,000 metric tons of mechanical erection. More than 50,000 inch diameter of welding was required. More than 1,230 metric tons of piping was erected. Doosan awarded a subcontract to First Kuwaiti General Trading and Contracting in 2008 for the construction of a few elements of the plant. First Kuwaiti completed the contractual works by 2010. Technocraft General Trading & Contracting was subcontracted by Doosan to install and align the mechanical equipment. The scope of work also included fit up, welding, supporting and testing of stainless steel piping for the recarbonation system. Technocraft installed and aligned more than 5,000 metric tons of mechanical equipments as part of the contract. ABSFIL supplied two RO membrane test systems of 44m3/day capacity each for the desalination plant. DKC supplied butterfly valves and control valves for the plant. Cumberland Cathodic Protection, a subsidiary of Al-Dorra Petroleum Services, supplied the impressed current cathodic protection (ICCP) system for steel tubular piles of the seawater intake jetty for First Kuwaiti. Toray Industries was awarded the contract to supply the RO membranes for the plant in September 2008. GJ System was contracted to supply a liquid analyser system for the plant.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data