Sibenik WPP

Sector: Hotel • Location: Croatia

Source: International Finance Corporation (IFC)

Project
Completed

RP Global (the sponsor) is proposing to develop the 43.7 MW Danilo Wind Farm straddling three locations covering a total area of approx 210 ha that together will produce 97.5 GWh per year. Specifically, the wind farm consists of three sets of turbines -- 9 turbines on Velika Glava site, which is approx 3 km apart from two adjacent sites Bubrig with 8 turbines and Crni Vrh site with 2 turbines -tot

Project Information FAQ

Project Information

4 Q
The project “Sibenik WPP” is an infrastructure initiative in the Hotel sector, located in Croatia. Taiyo aggregates data on it from International Finance Corporation (IFC).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

completed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

RP Global (the sponsor) is proposing to develop the 43.7 MW Danilo Wind Farm straddling three locations covering a total area of approx 210 ha that together will produce 97.5 GWh per year. Specifically, the wind farm consists of three sets of turbines -- 9 turbines on Velika Glava site, which is approx 3 km apart from two adjacent sites Bubrig with 8 turbines and Crni Vrh site with 2 turbines -totaling 19 turbines in all. The Project will have its own power substation, and will include 7,3 km double overhead 110 kV transmission line. The Danilo Wind Farm is located in the Dalmatia region about 15-16 km southeast of the town Šibenik in the area that is administratively split between municipalities Sibenik, Drnis and Ugresic. The distance to the Adriatic Sea is about 15 km. The wind farms sites are located on hills ridges with an elevation of about 420 to 540m meters above sea level. The wider plain area around the project location is open and mostly used for agricultural purposes and livestock grazing. The Project will be developed by RP Global, a renewable energy company that currently has several hundreds of MW of wind power under development in Portugal, France, Poland, Chile and Croatia. RP Global’s project management team will implement the Project through a multi-contract structure. Both supply and installation agreement and service agreement with EPK (“Enercon Partner Konzept”) for a duration of 15 years is being negotiated. The scope of supply includes delivery and installation of 19 Enercon E-82 E2 2,3 MW with 79 steel tower height and 82m rotor diameter. The wind farm will be connected to the grid through a 7,3 km double 110 kV overhead transmission line to the Podi industrial zone. Start of construction is scheduled for June 2012, while the commercial operation is expected to start by May 2013. This Project presents a first stage of the larger development (88 MW), for which RP Global has obtained the Location Permit from MofEnv of Croatia.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data