logo

Siberian Power Pipeline Phase Two

Sector: Power Generation (CCGT) • Location: Russia

Source: 매일경제

Project
Planned

The second phase of the Siberian Natural Gas Pipeline project aims to export natural gas from Siberia to China through land gas pipelines. This phase is crucial for Russia to replace losses in the European market and is currently under negotiation due to pricing disputes with China.

Status
Prospective
Sector
Power Generation (CCGT), Natural Gas
Location
Russia
Updated
22 Jul 2026
Source
매일경제

ConstructChat

Ask ConstructChat about Siberian Power Pipeline Phase Two

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “Siberian Power Pipeline Phase Two” is an infrastructure initiative in the Power Generation (CCGT) sector, located in Russia. Taiyo aggregates data on it from 매일경제.

Participants

Not available for this record.

Status

Original status

planned

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The second phase of the Siberian Natural Gas Pipeline project aims to export natural gas from Siberia to China through land gas pipelines. This phase is crucial for Russia to replace losses in the European market and is currently under negotiation due to pricing disputes with China.

Original sector

Energy

Location

Country

Russia

Source

Source

매일경제

URL

More Details

Record type

Project

Sector

Power Generation (CCGT), Natural Gas

Article published date

2025-05-13

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project