logo

Sibiu Public Transport Project (City Loan)

Sector: Road • Location: Romania

Source: European Bank for Reconstruction and Development (EBRD)

Project
Complete

In 2006 the EBRD has provided €15 million to finance the purchase of up to 30 new large buses for the municipal public transport company in Sibiu – Tursib - (the Company), and to finance a street upgrading programme with the City of Sibiu (the City). In 2009, the EBRD extended the financing to Tursib by an additional €2 million, to complement the existing loan signed in 2006. The operation was int

Project Information FAQ

Project Information

4 Q
The project “Sibiu Public Transport Project (City Loan)” is an infrastructure initiative in the Road sector, located in Romania. Taiyo aggregates data on it from European Bank for Reconstruction and Development (EBRD).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

complete

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

In 2006 the EBRD has provided €15 million to finance the purchase of up to 30 new large buses for the municipal public transport company in Sibiu – Tursib - (the Company), and to finance a street upgrading programme with the City of Sibiu (the City). In 2009, the EBRD extended the financing to Tursib by an additional €2 million, to complement the existing loan signed in 2006. The operation was intended to enable the Company to purchase 10 new large buses in addition to the buses financed by the original loan. The EBRD is now considering restructuring the €2 million loan extension signed with Tursib in 2009 (as yet undrawn) as well as further extending the financing by an additional € 2.8 million, for the relocation of the bus depot to the outskirts of the City, a location more appropriate for the transportation activity which the Company performs than the current City centre location. Incremental transition impact for the new loan extension is due to stem from: This will supersede the expected transition impact from the existing loan, which was due to be: €4.8 million loan extension, comprising €2 million restructured from the previous loan extension signed in 2009 (as yet undrawn) and another €2.8 million of new money. The existing project comprised the following facilities: The total cost of the new project (bus depot relocation) is estimated at €8.1 million. The total cost of the existing project was estimated at €20.4 million. For the new project: The new project has been categorised B in accordance with the Bank’s Environmental and Social Policy 2008. Environmental and social due diligence (ESDD) has been undertaken by the Bank’s Environment and Sustainability Department based on a review of the Company’s corporate management systems; relevant information provided by the Company; and a discussions with the Company’s personnel to evaluate the current operational performance and the risk management plans for the planned investment programme. The investigation showed that the potential future adverse impacts of the project will be site specific and addressed through appropriate mitigation measures. The transaction will enable the City to improve quality of public transport services and create tangible environmental and social benefits. The project implementation is limited to urban area within the boundaries of the City and no sensitive ecological receptors or protected zones are affected. It is confirmed that the project will not have adverse social impacts to local communities or other project affected parties, while a number of very tangible environmental and social benefits are likely to arise. The due diligence confirmed that the Company has efficient public communication, consultation and disclosure policy that in general meets the EBRD's requirements. In order to avoid, minimise and mitigate the potential adverse environmental and social (E&S) impacts of the project and ensure full compliance with national regulations and EBRD's Performance Requirements (PRs) an Environmental and Social Action Plan (ESAP) has been developed to address the necessary improvements in the Company's E&S management systems. The project will be monitored in terms of its environmental and social performance and implementation of the ESAP through annual E&S reports and site visits when deemed necessary. For the existing project: Categorised B (2008). The environmental and social due diligence, which included an independent audit and analysis, confirmed that the environmental and social impacts associated with the street rehabilitation programme and construction of one small road bridge will be mainly positive. The due diligence also confirmed that there will be no physical or economic displacement as a result of the Project and concluded that the management capacity of the Company to manage EHS and social issues will need to be developed during project implementation. There will be localised moderate impacts during the road improvement works related to noise, dust and vibration, generation and disposal of waste and temporary traffic restrictions. However, a comprehensive environmental and social action plan (ESAP) for Sibiu road rehabilitation has been developed to avoid, minimise and mitigate any potential adverse environmental and social impacts and liabilities arising from the project's construction and operation, and to ensure compliance with the respective EBRD's Performance Requirements (PRs). The ESAP will form part of the Loan Agreement. A Stakeholder Engagement Plan is prepared to ensure that communication with the relevant stakeholders is handled properly throughout project preparation and implementation, including the appropriate grievance procedure. The Municipality will submit to EBRD annual reports on environmental and social matters including progress on the implementation of the environmental and social action plan. Post-signing of the extension A procurement expert to assist the Company with the procurement of the construction of the new bus depot (€20,000 financed by the Bank) For consultant opportunities for projects financed by technical cooperation funds, visit procurement of consultants.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data