SID 372 Sanitary Sewer Reconstruction Section II
Sector: Water Supply and Storage • Location: Omaha, Nebraska, United States of America
Source: Dodge
- REMOVE 8 SANITARY SEWER PIPE PLUG 4 EA 2. REMOVE LIFT STATION 1 LS 3. REMOVE PAVEMENT 23 SY 4. CONSTRUCT 8 PVC SANITARY SEWER PIPE 8,139 LF 5. CONSTRUCT 8 PVC SANITARY SEWER PIPE (OVER 15 DEPTH) 140 LF 6. CONSTRUCT 6 PVC SANITARY SEWER PIPE 4,804 LF 7. CONSTRUCT 54 I.D. SANITARY MANHOLE (41) 539.0 VF 8. INSTALL EXTERNAL FRAME SEAL 41 EA 9. CONSTRUCT 8 SANITARY SEWER PIPE PLUG 2 EA 10. CONSTRUCT
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | closed |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | 1. REMOVE 8 SANITARY SEWER PIPE PLUG 4 EA 2. REMOVE LIFT STATION 1 LS 3. REMOVE PAVEMENT 23 SY 4. CONSTRUCT 8 PVC SANITARY SEWER PIPE 8,139 LF 5. CONSTRUCT 8 PVC SANITARY SEWER PIPE (OVER 15 DEPTH) 140 LF 6. CONSTRUCT 6 PVC SANITARY SEWER PIPE 4,804 LF 7. CONSTRUCT 54 I.D. SANITARY MANHOLE (41) 539.0 VF 8. INSTALL EXTERNAL FRAME SEAL 41 EA 9. CONSTRUCT 8 SANITARY SEWER PIPE PLUG 2 EA 10. CONSTRUCT 8 SANITARY SEWER COLLAR 1 EA 11. CONSTRUCT FOUNDATION ROCK (3 CLEAN) FOR TRENCH STABILIZATION 18... |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
More Water Supply and Storage projects in United States of America
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
- KITCEHN REMODEL, REPLACE CABINETS, WATER AND WASTE LINES REDIRECTED, NEW ELECTRICAL LINES FROM MAIN PANEL
- LAFCO PROCESS FOR NEW WATER CONNECTION ON COH WATER SERVICE
- BUILDING (A): MANUFACTURING/MANUFACTURING SUPPORT SPACE, BOILER REPLACE, WATER PURIFICATION SYSTEM, HVAC, 652 SF MAIN
