SID 577 Westbury Farm Water Quality Pond Conversion
Closed · Nebraska · Last reported Oct 2025
Source: Dodge
Convert silt basins, together with dirt work, placement of riprap aprons, seeding and matting, removal of vegetation, sidewalk, unsuitable silt, and perform all other work necessary or incidental thereto in the following locations: Pond A (South 216th and F Street) - Removal of Vegetation and pond grading within the boundary of the pond necessary to convert silt basin into dry detention water qual
- Status
- Closed
- Sector
- Waste Processing and Treatment, Car parking, Raw Materials, Road, Water Supply and Storage, Automotive, Commercial, Consumer Products, Government
- Location
- Elkhorn, Nebraska, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about SID 577 Westbury Farm Water Quality Pond Conversion
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Convert silt basins, together with dirt work, placement of riprap aprons, seeding and matting, removal of vegetation, sidewalk, unsuitable silt, and perform all other work necessary or incidental thereto in the following locations: Pond A (South 216th and F Street) - Removal of Vegetation and pond grading within the boundary of the pond necessary to convert silt basin into dry detention water quality pond. Pond B (South 219th and I Street) - Removal of Vegetation and pond grading within the b... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Nebraska |
City | Elkhorn |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Waste Processing and Treatment, Car parking, Raw Materials, Road, Water Supply and Storage, Automotive, Commercial, Consumer Products, Government |
Article published date | 2025-10-06 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Waste Processing and Treatment projects in United States of America
- JACK FOUNTAIN/HOLLOWAY RAY FM SNOWHILL CHURCH TO BRANCH
- West lake sammamish parkway phase 2
- 228th St. SE Roadway Repair near 15th Ave. SE
- Camden Lift Station
- REPLACE EXIST. CONVIENENCE STORE W/ NEW ONE, UPGRADE LANDSCA PE, SITE LIGHTING, DRAINAGE. ADD STARBUCKS DRIVETHRU W/ SPR
- PHASED APPROVAL FOR 1) METAL FRAMING & SHEETROCK & 2) 3 UNDE R SLAB DRAINS. REFER TO MAIN PERMIT 202205223
- (N) COMMERICAL SINKS: 3-COMPARTMENT SINK AND 2 ADDITIONAL SINKS WITH DRAINAGE AND WATER.
- NEW ADA BATHROOM PER PLAN AND SPECIFICATIONS AREA 66SF SCREE NED. (N) 4" SEWER LATERAL CONNECTION, (N) WATER FOUNDATION
