Sid Commons
Sector: Commercial • Location: California, United States of America (USA)
Source: City of Petaluma
The Project site comprises 19.2 gross acres of land, including 14.3 acres within the portion of Parcel Map #307 that are located on the west side of the Petaluma River and identified as a “Remainder Parcel” (principally APN 019-010-009), a 4.4-acre parcel known as the Webb parcel (APN 019-010-006), and the 0.5-acre Graylawn Avenue turnaround (APN 019-010-008). The Project includes a conceptual sit
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | Obfuscated Data |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The Project site comprises 19.2 gross acres of land, including 14.3 acres within the portion of Parcel Map #307 that are located on the west side of the Petaluma River and identified as a “Remainder Parcel” (principally APN 019-010-009), a 4.4-acre parcel known as the Webb parcel (APN 019-010-006), and the 0.5-acre Graylawn Avenue turnaround (APN 019-010-008). The Project includes a conceptual site plan for a 180-unit apartment complex, with the apartment units located within separate two to three-story apartment buildings (11 dwelling units/net acre) and includes a community clubhouse and an outdoor swimming pool. The project includes creating a flood terrace above the high water line abutting the Petaluma River as required by General Plan policy 8-P-28 in order to incrementally increase the storage capacity of the floodplain area. The project proposed no residential development in the floodplain. The 180-unit proposal reflects a reduction of 98 units, an increased setback from the Petaluma River, and additional tree and wetlands preservation in response to comments received on the 2018 draft EIR for the original 278 unit proposal and the final EIR. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
