SIDE 14-18 Robert ST
The status, timeline and source of this project. A free account opens every field.
Source: City of Boston
Remove and dispose of all existing siding down to sheathing. Supply & install new Hardie® Plank - 8.25" x 12'. Install new Hardie siding. Install new composite transition and base board. Install new 6K Aluminum gutter. Install new 3x4 elbows. Install new 3x4 brackets to support new downspout.
- Status
- Prospective
- Sector
- Steel, Metal, Commercial, Government
- Location
- Roslindale, Massachusetts, United States of America
- Updated
- 19 Nov 2026
- Source
- City of Boston
ConstructChat
Ask ConstructChat about SIDE 14-18 Robert ST
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | open |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | Remove and dispose of all existing siding down to sheathing. Supply & install new Hardie® Plank - 8.25" x 12'. Install new Hardie siding. Install new composite transition and base board. Install new 6K Aluminum gutter. Install new 3x4 elbows. Install new 3x4 brackets to support new downspout. |
Budget |
Location
Country | United States of America (USA) |
State | Massachusetts |
City | Roslindale |
Source
Source | City of Boston |
URL |
More Details
Record type | Project |
Sector | Steel, Metal, Commercial, Government |
Article published date | 2025-08-28 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
