logo
ProjectOpenBP

SIDE 572 Freeport ST

One of 10,000+ projects Taiyo tracks in Massachusetts.

Source: City of Boston

Strip down to the sheeting existing fiber cement siding only on the left elevation of the existing building only. Remove existing vapor barrier on left elevation only. Check all windows and install Grace Vycor over nailing fin. New gap flashing over all windows. Install new James Hardie vapor barrier on the left only. All seams shall be taped. Install new Fiber Cement siding 5” exposure cedar

Status
Prospective
Sector
Water Supply and Storage, Commercial, Government, Manufacturing (Industrial)
Location
Dorchester, Massachusetts, United States of America
Updated
19 Nov 2026
Source
City of Boston

ConstructChat

Ask ConstructChat about SIDE 572 Freeport ST

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “SIDE 572 Freeport ST” is an infrastructure initiative in the Water Supply and Storage sector, located in Dorchester, Massachusetts, United States of America. Taiyo aggregates data on it from City of Boston.

Participants

Sponsoring Agency

Status

Original status

open

Taiyo status

Prospective

Taiyo last update

2026-11-19

Contact

Not available for this record.

Description

Description

Strip down to the sheeting existing fiber cement siding only on the left elevation of the existing building only. Remove existing vapor barrier on left elevation only. Check all windows and install Grace Vycor over nailing fin. New gap flashing over all windows. Install new James Hardie vapor barrier on the left only. All seams shall be taped. Install new Fiber Cement siding 5” exposure cedar mill (color to match existing color) on left elevation only. Caulking and flashing will be done according James Hardie Standards. Included on this proposal disposal of all debris regarding strip and fiber cement installation. Included on this proposal all taxes, permits and equipments to complete the project. Warranty on workmanship will be 2 years for this project. All trim such as water table, outside corners, fascia board, rake board, soffit, freeze boards will remain. Water table and freeze board will have new cap flashing.

Budget

Location

Country

United States of America (USA)

State

Massachusetts

City

Dorchester

Source

Source

City of Boston

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Commercial, Government, Manufacturing (Industrial)

Article published date

2025-08-28

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project