logo
ProjectOpenBP

SIDE 6 Ringgold ST

Sector: Water Supply and Storage • Location: Roxbury, Massachusetts, United States of America

Source: City of Boston

Remove existing water damaged fiber cement siding from rear of residence. Replace with new primed cedar shingles Replace rotted window and door casing with new primed cedar casing Repair basement landing

Status
Prospective
Sector
Water Supply and Storage, Commercial, Government
Location
Roxbury, Massachusetts, United States of America
Updated
19 Nov 2026
Source
City of Boston

ConstructChat

Ask ConstructChat about SIDE 6 Ringgold ST

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “SIDE 6 Ringgold ST” is an infrastructure initiative in the Water Supply and Storage sector, located in Roxbury, Massachusetts, United States of America. Taiyo aggregates data on it from City of Boston.

Participants

Sponsoring Agency

Status

Original status

open

Taiyo status

Prospective

Taiyo last update

2026-11-19

Contact

Not available for this record.

Description

Description

Remove existing water damaged fiber cement siding from rear of residence. Replace with new primed cedar shingles Replace rotted window and door casing with new primed cedar casing Repair basement landing

Budget

Location

Country

United States of America (USA)

State

Massachusetts

City

Roxbury

Source

Source

City of Boston

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Commercial, Government

Article published date

2025-08-28

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project