SIDE 64 Westbourne ST
Sector: Steel • Location: Roslindale, Massachusetts, United States of America
Source: City of Boston
strip existing siding from home, install insulated vinyl siding per code 26.75sq, wrap all window and door casings to make maintenance free, cover 240’ of fascia boards with PVC coated Aluminum coil, install 240’ of vented vinyl soffits, replace 118’ of existing gutters with new Seamless 6k Gutters.
- Status
- Prospective
- Sector
- Steel, Metal, Residential, Commercial, Government
- Location
- Roslindale, Massachusetts, United States of America
- Updated
- 19 Nov 2026
- Source
- City of Boston
ConstructChat
Ask ConstructChat about SIDE 64 Westbourne ST
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | open |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | strip existing siding from home, install insulated vinyl siding per code 26.75sq, wrap all window and door casings to make maintenance free, cover 240’ of fascia boards with PVC coated Aluminum coil, install 240’ of vented vinyl soffits, replace 118’ of existing gutters with new Seamless 6k Gutters. |
Budget |
Location
Country | United States of America (USA) |
State | Massachusetts |
City | Roslindale |
Source
Source | City of Boston |
URL |
More Details
Record type | Project |
Sector | Steel, Metal, Residential, Commercial, Government |
Article published date | 2025-08-28 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Steel projects in United States of America
- STRUCTURAL STEEL FABRICATION AND ERECTION
- SR 7; SR 91 & SR 520 @ 4 LOCS - BRIDGE PRESERVATION
- SR 83 @ SHOAL CREEK
- Annenberg Science Complex - James M. Rosser Hall [027B-ASCR]
- ADD NEW PRE-FAB STEEL GARAGE 780SQ FT SHARES PLANS WITH 202104289 & 202104326
- REPLACE DAMAGED STEEL COLUMN
- Courthouse Commons Tunnel
- Los Angeles City Hall
