Sidewalk & Parking Improvements
Sector: Water Supply and Storage • Location: Polson, Montana, United States of America
Source: Dodge USA
Scope - The project consists of completing sidewalk and parking improvements along several streets in Columbia Falls including 1st St W, 2nd St W, 2nd St E, 3rd St E, 1st Ave W, and 5th St W. The project includes clearing and grubbing; topsoil removal; demolition of existing asphalt, sidewalk, and curb and gutter; storm water dry wells with castings; concrete curb, gutter, and sidewalk; asphalt pa
- Status
- Closed
- Sector
- Water Supply and Storage, Cement, Road, Waste Processing and Treatment, Car parking, Automotive, Government, Commercial
- Location
- Polson, Montana, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Sidewalk & Parking Improvements
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Scope - The project consists of completing sidewalk and parking improvements along several streets in Columbia Falls including 1st St W, 2nd St W, 2nd St E, 3rd St E, 1st Ave W, and 5th St W. The project includes clearing and grubbing; topsoil removal; demolition of existing asphalt, sidewalk, and curb and gutter; storm water dry wells with castings; concrete curb, gutter, and sidewalk; asphalt paving; topsoil placement; street signs; seeding; traffic control; and other miscellaneous work. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Montana |
City | Polson |
Source
Source reliability | Medium |
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Cement, Road, Waste Processing and Treatment, Car parking, Automotive, Government, Commercial |
Article published date | 2024-01-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
