Sidewalk and Watermain Replacement - Phase 1
Sector: Water Supply and Storage • Location: Port Charlotte, Florida, United States of America
Source: Dodge USA
This project consists of constructing a 5-foot sidewalk along the west side of Dorchester Street. The project includes sidewalk, drainage pipes, drainage improvements, utility adjustments, watermain removal and installation.
- Status
- Closed
- Sector
- Water Supply and Storage, Seaport, Waste Processing and Treatment, Commercial, Car parking, Power Transmission, Road, Government, Automotive, Power Generation (CCGT)
- Location
- Port Charlotte, Florida, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Sidewalk and Watermain Replacement - Phase 1
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bid Results |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | This project consists of constructing a 5-foot sidewalk along the west side of Dorchester Street. The project includes sidewalk, drainage pipes, drainage improvements, utility adjustments, watermain removal and installation. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Florida |
City | Port Charlotte |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Seaport, Waste Processing and Treatment, Commercial, Car parking, Power Transmission, Road, Government, Automotive, Power Generation (CCGT) |
Article published date | 2024-10-28 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
