Sidewalk Concrete Grinding
The status, timeline and source of this project. A free account opens every field.
Source: Dodge USA
Eliminate trip hazards in sidewalks by cutting or grinding lifted areas and trip hazards at various locations throughout the City. Contractor is required to remove all trip hazards to be ADA compliant, and performed per APWA and MUTCD requirements. Contractor must include and utilize dust mitigation methods during this project. Contractor will be required to provide a traffic control plan for cert
- Status
- Closed
- Sector
- Cement, Government, Power Transmission, Power Generation (CCGT), Car parking, Commercial, Automotive
- Location
- Riverton, Utah, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Sidewalk Concrete Grinding
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bid Results |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Eliminate trip hazards in sidewalks by cutting or grinding lifted areas and trip hazards at various locations throughout the City. Contractor is required to remove all trip hazards to be ADA compliant, and performed per APWA and MUTCD requirements. Contractor must include and utilize dust mitigation methods during this project. Contractor will be required to provide a traffic control plan for certain areas of the project before they are given notice to proceed. All work shall be completed wit... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Utah |
City | Riverton |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Cement, Government, Power Transmission, Power Generation (CCGT), Car parking, Commercial, Automotive |
Article published date | 2024-12-16 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Cement projects in United States of America
- CS 1081/GREENVILLE STREET @ CSX RAILROAD IN LAGRANGE
- CR 1332/OLD ROSWELL RD FM .20 MI W OF MANSELL RD TO PR 9517
- SR 83 @ SHOAL CREEK
- OPERATE CONCRETE RECYCLING FACILITY UNTIL PERMANANT FACILITY IS APPROVED AND OPERATIONAL ON DEPOT ROAD
- REMOVE TILE ROOF & INSTALL OSB & (N) 30 LB FELT PAPER & NEW CONCRETE TILES (9 LB/SF), COLOR: APPALATIAN BLEND
- SWIMMING POOL REMODEL. UPGRADE PLUMBING, REPLACE CONCRETE, REPAIR POOL FENCING
- (N)WASHING SYSTM & EQUIPMT,REFRIGERATION UNIT,EXHAUST FAN & DUCTING,CONCRETE PAD,(N)HOPPER & INCLINE CONVEYOR,FIRE WALL
- Inova Women's Hospital & Children's Hospital
