Sidewalk Extension PH III
One of 10,000+ projects Taiyo tracks in Alabama.
Source: Dodge
Sidewalk extensions along main street from peck sutton road to 6th street including 936 sy removing Curb and gutter, 745 tons crushed aggregate, section 825, 235 tons superpave bituminous concrete Wearing surface layer, patching, 10 lf 12 trench drain, mobilization, 1,686 sy concrete sidewalk, 4 Thick, 1,551 sy concrete driveway, 6 thick, 128 sf detectable warning surface, 278 sy concrete curb Ram
- Status
- Closed
- Sector
- Cement, Government, Car parking, Road, Automotive, Waste Processing and Treatment, Commercial
- Location
- Grant, Alabama, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Sidewalk Extension PH III
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Sidewalk extensions along main street from peck sutton road to 6th street including 936 sy removing Curb and gutter, 745 tons crushed aggregate, section 825, 235 tons superpave bituminous concrete Wearing surface layer, patching, 10 lf 12 trench drain, mobilization, 1,686 sy concrete sidewalk, 4 Thick, 1,551 sy concrete driveway, 6 thick, 128 sf detectable warning surface, 278 sy concrete curb Ramp, 244 lf concrete gutter, 44 lf concrete gutter (valley), 424 concrete curb, type a, 73 lf concr... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Alabama |
City | Grant |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Cement, Government, Car parking, Road, Automotive, Waste Processing and Treatment, Commercial |
Article published date | 2025-01-20 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Cement projects in United States of America
- CS 1081/GREENVILLE STREET @ CSX RAILROAD IN LAGRANGE
- CR 1332/OLD ROSWELL RD FM .20 MI W OF MANSELL RD TO PR 9517
- SR 83 @ SHOAL CREEK
- OPERATE CONCRETE RECYCLING FACILITY UNTIL PERMANANT FACILITY IS APPROVED AND OPERATIONAL ON DEPOT ROAD
- REMOVE TILE ROOF & INSTALL OSB & (N) 30 LB FELT PAPER & NEW CONCRETE TILES (9 LB/SF), COLOR: APPALATIAN BLEND
- SWIMMING POOL REMODEL. UPGRADE PLUMBING, REPLACE CONCRETE, REPAIR POOL FENCING
- (N)WASHING SYSTM & EQUIPMT,REFRIGERATION UNIT,EXHAUST FAN & DUCTING,CONCRETE PAD,(N)HOPPER & INCLINE CONVEYOR,FIRE WALL
- Inova Women's Hospital & Children's Hospital
