Sidewalk Improvements at TSTC In Waco
Sector: Car parking • Location: Bellmead, Texas, United States of America
Source: Dodge USA
Scope of Work This project is to construct new sidewalks for pedestrian access from Griffith Hall to the Student Services Center. The project includes tree clearing and demolition of existing hardscaping and sidewalks; sidewalk improvements that include the installation of approximately 160 LF of dual 5-foot sidewalk, approximately 390 LF of single 5-foot sidewalk, and approximately 100 LF of 5-fo
- Status
- Closed
- Sector
- Car parking, Education, Automotive, Commercial, Residential, Manufacturing (Industrial)
- Location
- Bellmead, Texas, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Sidewalk Improvements at TSTC In Waco
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Scope of Work This project is to construct new sidewalks for pedestrian access from Griffith Hall to the Student Services Center. The project includes tree clearing and demolition of existing hardscaping and sidewalks; sidewalk improvements that include the installation of approximately 160 LF of dual 5-foot sidewalk, approximately 390 LF of single 5-foot sidewalk, and approximately 100 LF of 5-foot forklift path sidewalk that includes additional flat work and curb ramp; installation of two c... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Texas |
City | Bellmead |
Source
Source reliability | Medium |
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Car parking, Education, Automotive, Commercial, Residential, Manufacturing (Industrial) |
Article published date | 2024-01-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Car parking projects in United States of America
- FRANKLIN CO. AIRPORT DRIVES & PARKING
- SR 7 FROM FLORIDA STATE LINE TO NSR
- SIMPSON STREET/JONES AVE FM NORTHSIDE DR TO LUCKIE ST- GRTA
- CULVERT & BRIDGE CULVERT DURHAM PARK ROAD
- SR 9 @ CR 3705/AC SMITH RD
- CR 478/MOULTRIE LENOX RD @ LITTLE RVR 9 MI E OF NORMAN PARK
- I-285 FM I-75/CLAYTON THRU FULTON TO I-20/DEKALB
- LINCOLNTON DOWNTOWN STREETSCAPE - PHASE II
