Sidewalk Repair and Replacement Services
Sector: Cement • Location: Belton, South Carolina, United States of America
Source: Dodge USA
The contractor shall furnish all labor, equipment, tools, fuels, materials, and supervision necessary for the performance of all operations for construction of repair and replacement sidewalks for the City of Belton. The scope of services includes, but is not to be limited to, the following: a. Replacement of 5-foot-wide concrete sidewalks as indicated by the City and upon 3 request. b. Removal an
- Status
- Closed
- Sector
- Cement, Car parking, Government, Automotive, Commercial
- Location
- Belton, South Carolina, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Sidewalk Repair and Replacement Services
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The contractor shall furnish all labor, equipment, tools, fuels, materials, and supervision necessary for the performance of all operations for construction of repair and replacement sidewalks for the City of Belton. The scope of services includes, but is not to be limited to, the following: a. Replacement of 5-foot-wide concrete sidewalks as indicated by the City and upon 3 request. b. Removal and replacement of existing damaged or raised sidewalks. c. Removal and disposal of excess material... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | South Carolina |
City | Belton |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Cement, Car parking, Government, Automotive, Commercial |
Article published date | 2024-10-08 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Cement projects in United States of America
- CS 1081/GREENVILLE STREET @ CSX RAILROAD IN LAGRANGE
- CR 1332/OLD ROSWELL RD FM .20 MI W OF MANSELL RD TO PR 9517
- SR 83 @ SHOAL CREEK
- OPERATE CONCRETE RECYCLING FACILITY UNTIL PERMANANT FACILITY IS APPROVED AND OPERATIONAL ON DEPOT ROAD
- REMOVE TILE ROOF & INSTALL OSB & (N) 30 LB FELT PAPER & NEW CONCRETE TILES (9 LB/SF), COLOR: APPALATIAN BLEND
- SWIMMING POOL REMODEL. UPGRADE PLUMBING, REPLACE CONCRETE, REPAIR POOL FENCING
- (N)WASHING SYSTM & EQUIPMT,REFRIGERATION UNIT,EXHAUST FAN & DUCTING,CONCRETE PAD,(N)HOPPER & INCLINE CONVEYOR,FIRE WALL
- Inova Women's Hospital & Children's Hospital
