Sidewalk Replacement
Sector: Water Supply and Storage • Location: Utica, New York, United States of America
Source: Dodge USA
Remove and dispose of 1000 linear foot of existing deteriorated sidewalks. The facility will be responsible determining the sidewalks to be removed. 2) Excavate area to achieve appropriate width and depth for new base material for sidewalks 3) Apply 4-6 inches of new crushed stone and compact to achieve proper grade 4) Install concrete forms and bracing to meet grade and shed water 5) install wire
- Status
- Closed
- Sector
- Water Supply and Storage, Car parking, Commercial, Government, Cement, Automotive
- Location
- Utica, New York, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Sidewalk Replacement
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bid Results |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Remove and dispose of 1000 linear foot of existing deteriorated sidewalks. The facility will be responsible determining the sidewalks to be removed. 2) Excavate area to achieve appropriate width and depth for new base material for sidewalks 3) Apply 4-6 inches of new crushed stone and compact to achieve proper grade 4) Install concrete forms and bracing to meet grade and shed water 5) install wire mesh to help reinforce concrete 6) Pour concrete (4000 lb. mix) and screed, float, edge and trow... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | New York |
City | Utica |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Car parking, Commercial, Government, Cement, Automotive |
Article published date | 2024-12-02 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
