SIDEWALKS & LIGHTING IN DOWNTOWN VIDALIA
Sector: Water Supply and Storage • Location: Vidalia, Georgia, United States of America
Source: Georgia Department of Transportation (GDOT)
This proj. consists of streetscape imprvmts. along various streets in downtown Vidalia. The improvements include the construction of new sidewalks; curb repairs, minor drainage work, landscaping, & street furniture. The project will consist of approximately 0.40 miles of resurfacing on McIntosh St, SR 130 (Pine St), & Thompson St, resurfacing approximately 4,250 square yards of downtown parking
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | complete |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | This proj. consists of streetscape imprvmts. along various streets in downtown Vidalia. The improvements include the construction of new sidewalks; curb repairs, minor drainage work, landscaping, & street furniture. The project will consist of approximately 0.40 miles of resurfacing on McIntosh St, SR 130 (Pine St), & Thompson St, resurfacing approximately 4,250 square yards of downtown parking, 2,376' of concrete sidewalk, typically 5' to 6' wide & incorporating brick pavers, stamped concrete, & tree grates to achieve a streetscape appearance. Existing sidewalks, curb & gutter, driveways, concrete slab, & trees will be removed and replaced. Curb ramps will be reconstructed to comply with ADA standards. Landscaped trees will be added for beautification in tree wells between the back of the curb & sidewalk. The streets within the project limits & a parking area will be resurfaced with minor widening. Waterlines for landscape irrigation will be located below the proposed sidewalks. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
More Water Supply and Storage projects in United States of America
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
- KITCEHN REMODEL, REPLACE CABINETS, WATER AND WASTE LINES REDIRECTED, NEW ELECTRICAL LINES FROM MAIN PANEL
- LAFCO PROCESS FOR NEW WATER CONNECTION ON COH WATER SERVICE
- BUILDING (A): MANUFACTURING/MANUFACTURING SUPPORT SPACE, BOILER REPLACE, WATER PURIFICATION SYSTEM, HVAC, 652 SF MAIN
