logo

Sidi Driss Dam Construction Project

Sector: Residential • Location: Morocco

Source: African Development Bank (AfDB)

Project

The present intervention concerns the Sidi Driss Dam Construction Project. The construction of the Sidi Driss intake dam forms the first phase of a vast “Central Haouz Development Programme” which, in addition to the construction of the Sidi Driss intake dam and that of Ait Chouarit, involves the raising of the Lalla Takerkoust dam, completion of a 128 km long canal with 20 m per second capacity h

Project Information FAQ

Project Information

4 Q
The project “Sidi Driss Dam Construction Project” is an infrastructure initiative in the Residential sector, located in Morocco. Taiyo aggregates data on it from African Development Bank (AfDB).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

Obfuscated Data

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The present intervention concerns the Sidi Driss Dam Construction Project. The construction of the Sidi Driss intake dam forms the first phase of a vast “Central Haouz Development Programme” which, in addition to the construction of the Sidi Driss intake dam and that of Ait Chouarit, involves the raising of the Lalla Takerkoust dam, completion of a 128 km long canal with 20 m per second capacity head, a hydro-agricultural scheme covering an area of 57, 500 ha; and the construction of a hydro-electric plant and a sugar factory. The Sidi Driss dam should provide primarily the drinking water supply of the city of Marrakech and irrigation water from the Great Hydraulic Central Haouz, through the bypass channel whose catch is located immediately downstream of the dam. It should be one of the basic components in a proposed comprehensive water infrastructure to facilitate the intensive agricultural development of an additional 51,000 ha. A substantial quantity of electric power should be produced.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data