Sidi Driss Dam Construction Project
Sector: Manufacturing (Industrial) • Location: Morocco
Source: African Development Bank (AfDB)
The present intervention concerns the Sidi Driss Dam Construction Project. The construction of the Sidi Driss intake dam forms the first phase of a vast “Central Haouz Development Programme” which, in addition to the construction of the Sidi Driss intake dam and that of Ait Chouarit, involves the raising of the Lalla Takerkoust dam, completion of a 128 km long canal with 20 m per second capacity h
- Sector
- Manufacturing (Industrial), Commercial, Water Supply and Storage, Power Generation (CCGT), Hydro, Residential, Government, Raw Materials
- Location
- Morocco
- Updated
- 22 Jul 2026
- Source
- African Development Bank (AfDB)
ConstructChat
Ask ConstructChat about Sidi Driss Dam Construction Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The present intervention concerns the Sidi Driss Dam Construction Project. The construction of the Sidi Driss intake dam forms the first phase of a vast “Central Haouz Development Programme” which, in addition to the construction of the Sidi Driss intake dam and that of Ait Chouarit, involves the raising of the Lalla Takerkoust dam, completion of a 128 km long canal with 20 m per second capacity head, a hydro-agricultural scheme covering an area of 57, 500 ha; and the construction of a hydro-electric plant and a sugar factory. The Sidi Driss dam should provide primarily the drinking water supply of the city of Marrakech and irrigation water from the Great Hydraulic Central Haouz, through the bypass channel whose catch is located immediately downstream of the dam. It should be one of the basic components in a proposed comprehensive water infrastructure to facilitate the intensive agricultural development of an additional 51,000 ha. A substantial quantity of electric power should be produced. |
Original sector | Water Supply & Sanitation |
Budget |
Location
Country | Morocco |
Source
Source | African Development Bank (AfDB) |
URL |
More Details
Record type | Project |
Sector | Manufacturing (Industrial), Commercial, Water Supply and Storage, Power Generation (CCGT), Hydro, Residential, Government, Raw Materials |
Article published date | 2025-12-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
