logo
ProjectClosed

SIEPAC Central American Electric Interconnection

One of 10,000+ projects Taiyo tracks in Regional.

Source: Inter-American Development Bank (IADB)

Under the SIEPAC project, a 1,830-km electricity transmission line, with a 230 kilovolt capacity will be built from Guatemala to Panama. The project is a reformulation of projects CA0007 and CA0010, approved in 1997.

Status
Closed
Sector
Power Generation (CCGT), Government
Location
World
Updated
22 Jul 2026
Source
Inter-American Development Bank (IADB)

ConstructChat

Ask ConstructChat about SIEPAC Central American Electric Interconnection

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “SIEPAC Central American Electric Interconnection” is an infrastructure initiative in the Power Generation (CCGT) sector, located in Regional. Taiyo aggregates data on it from Inter-American Development Bank (IADB).

Participants

Sponsoring Agency

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Under the SIEPAC project, a 1,830-km electricity transmission line, with a 230 kilovolt capacity will be built from Guatemala to Panama. The project is a reformulation of projects CA0007 and CA0010, approved in 1997.

Original sector

ENERGY

Budget

Location

Country

World

Source

Source

Inter-American Development Bank (IADB)

URL

More Details

Record type

Project

Sector

Power Generation (CCGT), Government

Article published date

2025-06-02

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project