Sierra College Applied Technology Ctr Modernization
The status, timeline and source of this project. A free account opens every field.
Source: Dodge USA
The Project includes modernization and seismic rehabilitation of two (2) existing lab buildings, H & N, on the Sierra College Rocklin Campus. The structural modifications include new attached additions, new shear walls, new steel braced frames, retrofit of existing steel and concrete seismic connections, and new openings in existing concrete walls. The interior renovations include replacement of p
- Status
- Prospective
- Sector
- Steel, Commercial, Cement, Government, Education, Power Transmission, Metal, Manufacturing (Industrial), Power Generation (CCGT)
- Location
- Rocklin, California, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Sierra College Applied Technology Ctr Modernization
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | GC Bidding-Invitation |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Project includes modernization and seismic rehabilitation of two (2) existing lab buildings, H & N, on the Sierra College Rocklin Campus. The structural modifications include new attached additions, new shear walls, new steel braced frames, retrofit of existing steel and concrete seismic connections, and new openings in existing concrete walls. The interior renovations include replacement of partition walls, slab on grade replacement at new utilities, and equipment anchorage. A new covere... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | California |
City | Rocklin |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Steel, Commercial, Cement, Government, Education, Power Transmission, Metal, Manufacturing (Industrial), Power Generation (CCGT) |
Article published date | 2024-11-04 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Steel projects in United States of America
- STRUCTURAL STEEL FABRICATION AND ERECTION
- SR 7; SR 91 & SR 520 @ 4 LOCS - BRIDGE PRESERVATION
- SR 83 @ SHOAL CREEK
- Annenberg Science Complex - James M. Rosser Hall [027B-ASCR]
- ADD NEW PRE-FAB STEEL GARAGE 780SQ FT SHARES PLANS WITH 202104289 & 202104326
- REPLACE DAMAGED STEEL COLUMN
- Courthouse Commons Tunnel
- Los Angeles City Hall
