Sierra Del Sol Resurfacing
Sector: Cement • Location: California, United States of America
Source: Riverside County
Limits: Ramon Road to La Canada Way Length: Approximately 0.25 miles District: 4 Community: Thousand Palms
The County of Riverside Transportation Department is proposing to resurface approximately 0.25 miles of Sierra Del Sol from Ramon Road to La Canada Way. Sierra Del Sol is classified as a Local Street in the County of Riversides General Plan. Sierra Del Sol currently ranges from 26-73 feet w
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | closed |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | Limits: Ramon Road to La Canada Way Length: Approximately 0.25 miles District: 4 Community: Thousand Palms The County of Riverside Transportation Department is proposing to resurface approximately 0.25 miles of Sierra Del Sol from Ramon Road to La Canada Way. Sierra Del Sol is classified as a Local Street in the County of Riversides General Plan. Sierra Del Sol currently ranges from 26-73 feet wide with dike and curb/gutter along various segments of the roadway. The proposed project will include removing the roadway (from Ramon Road to 80 feet northerly of Ramon Road) and pulverizing the roadway (from 80 feet northerly of Ramon Road to La Canada Way) followed by overlaying or placing back with Hot Mix Asphalt (HMA). The proposed project will also include: Construction of asphalt concrete driveways Reconstruction of asphalt concrete dike, asphalt concrete driveways, and concrete driveways Placement of safety edge and shoulder backing Utility adjustments Striping of roadway, including pavement markers and reflectors Salvage/removal and installation of new signs No additional right-of-way will be required to construct the proposed improvements. The project improvements will not be within the existing footprint of the roadway and will raise the existing roadway profile by 0.32 feet in the pulverize and overlay treatment areas. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
