logo
Project

Sierra Leone - Bumbuna Hydro-Electric Project (BHP)

Sector: Manufacturing (Industrial) • Location: Sierra Leone

Source: African Development Bank (AfDB)

The Bumbuna Hydroelectric Project (BHP) derived from a United Nations Development Program financed study (1970/71) which consisted of a 15 years electricity supply development plan for Sierra Leone. The project supplies Sierra Leone with the least cost option for addressing the energy shortage, and supplies a much needed infrastructure on which the country relies to build development projects. The

Sector
Manufacturing (Industrial), Commercial, Power Generation (CCGT), Hydro, Geothermal, Government
Location
Sierra Leone
Updated
22 Jul 2026
Source
African Development Bank (AfDB)

ConstructChat

Ask ConstructChat about Sierra Leone - Bumbuna Hydro-Electric Project (BHP)

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Sierra Leone - Bumbuna Hydro-Electric Project (BHP)” is an infrastructure initiative in the Manufacturing (Industrial) sector, located in Sierra Leone. Taiyo aggregates data on it from African Development Bank (AfDB).

Participants

Sponsoring Agency

Status

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The Bumbuna Hydroelectric Project (BHP) derived from a United Nations Development Program financed study (1970/71) which consisted of a 15 years electricity supply development plan for Sierra Leone. The project supplies Sierra Leone with the least cost option for addressing the energy shortage, and supplies a much needed infrastructure on which the country relies to build development projects. The hydro-power plant relieves the country from the burden of heavy expenses by reducing the need for diesel fuel for production of electricity. The project basically consists of the construction of a 50 MW hydroelectric power station at Bumbuna and the erection of a 200 km transmission line to transport the electricity produced from Bumbuna to Freetown, Makeni and Lunsar. The project when completed will result in the replacement of thermal power by relatively cheap and reliable hydropower in the National Grid. This in turn will result in i) the saving of foreign exchange spent on fuel and spare parts for diesel generation; ii) the enhancement of the development of the industrial, mining and commercial activities; iii) improvement of the standard of living of the population; and iv) consumers presently relying on their own generation will switch over to hydropower supply thus resulting in benefits to the economy.

Original sector

Energy

Budget

Location

Country

Sierra Leone

Source

Source

African Development Bank (AfDB)

URL

More Details

Record type

Project

Sector

Manufacturing (Industrial), Commercial, Power Generation (CCGT), Hydro, Geothermal, Government

Article published date

2025-12-15

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project