logo

Sierra Leone - Bumbuna Hydro-Electric Project (BHP)

Sector: Geothermal • Location: Sierra Leone

Source: African Development Bank (AfDB)

Project

The Bumbuna Hydroelectric Project (BHP) derived from a United Nations Development Program financed study (1970/71) which consisted of a 15 years electricity supply development plan for Sierra Leone. The project supplies Sierra Leone with the least cost option for addressing the energy shortage, and supplies a much needed infrastructure on which the country relies to build development projects. The

Project Information FAQ

Project Information

4 Q
The project “Sierra Leone - Bumbuna Hydro-Electric Project (BHP)” is an infrastructure initiative in the Geothermal sector, located in Sierra Leone. Taiyo aggregates data on it from African Development Bank (AfDB).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

Obfuscated Data

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The Bumbuna Hydroelectric Project (BHP) derived from a United Nations Development Program financed study (1970/71) which consisted of a 15 years electricity supply development plan for Sierra Leone. The project supplies Sierra Leone with the least cost option for addressing the energy shortage, and supplies a much needed infrastructure on which the country relies to build development projects. The hydro-power plant relieves the country from the burden of heavy expenses by reducing the need for diesel fuel for production of electricity. The project basically consists of the construction of a 50 MW hydroelectric power station at Bumbuna and the erection of a 200 km transmission line to transport the electricity produced from Bumbuna to Freetown, Makeni and Lunsar. The project when completed will result in the replacement of thermal power by relatively cheap and reliable hydropower in the National Grid. This in turn will result in i) the saving of foreign exchange spent on fuel and spare parts for diesel generation; ii) the enhancement of the development of the industrial, mining and commercial activities; iii) improvement of the standard of living of the population; and iv) consumers presently relying on their own generation will switch over to hydropower supply thus resulting in benefits to the economy.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data