The Rehabilitation and Extension of Bo-Kenema's Distribution System Project aims at upgrading and extending the Bo and Kenema power distribution network. The project is identified as a key deliverable of the Government's Post Ebola Recovery Program (PERP), which is in line with Sierra Leone's Agenda for Prosperity (A4P) renewed focus. The project will increase its power transfer capacity and incr

Project Information FAQ

Project Information

4 Q
The project “Sierra Leone - Rehabilitation and Extension of Bo-Kenema Distribution System Project” is an infrastructure initiative in the Manufacturing (Industrial) sector, located in Sierra Leone. Taiyo aggregates data on it from African Development Bank (AfDB).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

Obfuscated Data

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The Rehabilitation and Extension of Bo-Kenema's Distribution System Project aims at upgrading and extending the Bo and Kenema power distribution network. The project is identified as a key deliverable of the Government's Post Ebola Recovery Program (PERP), which is in line with Sierra Leone's Agenda for Prosperity (A4P) renewed focus. The project will increase its power transfer capacity and increase reliability and availability of power supply in the the Bo-Kenema area, in Sierra Leone. More specifically, the project will focus on (i) upgrading and building a 70 kilometre (km) overhead 33 kilovolt (kV) line between Bo and Kenema along with the construction of two primary substations and rehabilitation of two city centres 33/11 kV substations in Bo and Kenema; (ii) extending medium voltage (MV) and high voltage (HV) distribution network in both cities; (iii) implementing an end-user connection campaign with the objective to connect 37 000 additional households to the grid; (iv) providing services for preparation of designs and bid documents; (v) providing capacity building to Electricity Supply and Distribution Authority's (EDSA) relevant stakeholders; and vi) arranging for temporary power generation during construction. The total project cost is estimated at UA 38.08 million of which, the African Development Bank will contribute UA 9.309 million, the Department for International Development (DFID) UA 27.84 million, and the Government of Sierra Leone (GoSL) UA 0.93 million.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data