SIGALDA HYDROELECTRIC
Sector: Water Supply and Storage • Location: Iceland
Source: World Bank Group
The project would include: (a) construction of a hydroelectric project on the Tungnaa, about 100 miles from Reykjavik, including a 44-m high rockfill dam and a power house with two 50-MW generating units; (b) construction of a 35-km 220-KV transmission line; from Sigalda to Burfell with associated substations; and (c) consulting services for detailed engineering and supervision over construction.
- Status
- Closed
- Sector
- Water Supply and Storage, Power Generation (CCGT), Hydro, Government
- Location
- Iceland
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about SIGALDA HYDROELECTRIC
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project would include: (a) construction of a hydroelectric project on the Tungnaa, about 100 miles from Reykjavik, including a 44-m high rockfill dam and a power house with two 50-MW generating units; (b) construction of a 35-km 220-KV transmission line; from Sigalda to Burfell with associated substations; and (c) consulting services for detailed engineering and supervision over construction. |
Original sector | (Historic)Electric Power & Other Energy |
Location
Country | Iceland |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Power Generation (CCGT), Hydro, Government |
Article published date | 2025-12-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
