logo

Signal Butte Water Treatment Plant Expansion

Under construction · Arizona · Last reported Mar 2026

Source: StateTech Magazine

Project
Under Construction

Expansion project to double the plant capacity from 24 million to 48 million gallons per day, including the addition of an 8 million-gallon reservoir and pump upgrades to improve resiliency in southeast Mesa.

Status
Under Construction
Sector
Water Supply and Storage
Location
Mesa, Arizona, United States of America
Updated
22 Jul 2026
Source
StateTech Magazine

ConstructChat

Ask ConstructChat about Signal Butte Water Treatment Plant Expansion

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “Signal Butte Water Treatment Plant Expansion” is an infrastructure initiative in the Water Supply and Storage sector, located in Mesa, Arizona, United States. Taiyo aggregates data on it from StateTech Magazine.

Participants

Not available for this record.

Status

Original status

under construction

Taiyo status

Under Construction

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Expansion project to double the plant capacity from 24 million to 48 million gallons per day, including the addition of an 8 million-gallon reservoir and pump upgrades to improve resiliency in southeast Mesa.

Original sector

Water Resources

Location

Country

United States of America (USA)

State

Arizona

City

Mesa

Source

Source

StateTech Magazine

URL

More Details

Record type

Project

Sector

Water Supply and Storage

Article published date

2026-03-27

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project