SIGNES 363 Congress ST
One of 10,000+ projects Taiyo tracks in Massachusetts.
Source: City of Boston
Manufacture and install (1) double sided, pole mounted, custom round cabinet signs - Aluminum fabricated cabinets with painted aluminum face and internal LED power supply, custom aluminum retainer with perimeter halo-lighting and concealed LEDs (halo-lit), 2" deep halo-lit LED aluminum channel letters with clear polycarbonate backer (halo-lit), (2) single sided 1/8" thick round aluminum "EV Chargi
- Status
- Prospective
- Sector
- Manufacturing (Industrial), Electric Vehicles (EVs), Power Generation (CCGT), Automotive, Steel, Metal, Commercial, Government
- Location
- Boston, Massachusetts, United States of America
- Updated
- 19 Nov 2026
- Source
- City of Boston
ConstructChat
Ask ConstructChat about SIGNES 363 Congress ST
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | open |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | Manufacture and install (1) double sided, pole mounted, custom round cabinet signs - Aluminum fabricated cabinets with painted aluminum face and internal LED power supply, custom aluminum retainer with perimeter halo-lighting and concealed LEDs (halo-lit), 2" deep halo-lit LED aluminum channel letters with clear polycarbonate backer (halo-lit), (2) single sided 1/8" thick round aluminum "EV Charging Station" signs, 1-1/2"x4" square steel horizontal bracket arms welded to 4" square steel post with bottom welded, matching plate (see page 3 of drawings), painted aluminum fabricated base, J-bolt cage provided by Viewpoint Sign &; Awning, overall height from grade is 14'6"h, overall projection is 58", height of bottom of sign from grade is 8' E - Plan |
Budget |
Location
Country | United States of America (USA) |
State | Massachusetts |
City | Boston |
Source
Source | City of Boston |
URL |
More Details
Record type | Project |
Sector | Manufacturing (Industrial), Electric Vehicles (EVs), Power Generation (CCGT), Automotive, Steel, Metal, Commercial, Government |
Article published date | 2025-08-28 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Manufacturing (Industrial) projects in United States of America
- SR 75 FROM SR 2 TO NORTH CAROLINA STATE LINE
- SR 20 FM PRESTON HILLS/LAUREL DR TO CR 715/REYNOLDS RD
- STRUCTURAL STEEL FABRICATION AND ERECTION
- SR 10 FROM CR 107/NORTH LEG DRIVE TO CR 2485/HALE STREET
- CS 493/INDUSTRIAL BLVD FROM SR 19 TO SR 31 - TIA
- SR 19;SR 23; SR 26 & SR 204 @ 9 LOCS - BRIDGE PRESERVATION
- PAULDING COUNTY ITS SYSTEM EXPANSION - PHASE II
- West lake sammamish parkway phase 2
