SIGNES 95 Brighton AV
The status, timeline and source of this project. A free account opens every field.
Source: City of Boston
Replace existing Budget sign panels with the new name AVIS/Budget sign panels on two (2) existing illuminated wall signs to be installed by the professional installer J. Newman. BRA has approved the proposed changes on August 22, 2013, see attached document.
- Status
- Prospective
- Sector
- Commercial, Government
- Location
- Allston, Massachusetts, United States of America
- Updated
- 19 Nov 2026
- Source
- City of Boston
ConstructChat
Ask ConstructChat about SIGNES 95 Brighton AV
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | open |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | Replace existing Budget sign panels with the new name AVIS/Budget sign panels on two (2) existing illuminated wall signs to be installed by the professional installer J. Newman. BRA has approved the proposed changes on August 22, 2013, see attached document. |
Budget |
Location
Country | United States of America (USA) |
State | Massachusetts |
City | Allston |
Source
Source | City of Boston |
URL |
More Details
Record type | Project |
Sector | Commercial, Government |
Article published date | 2025-08-28 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
