Sigora Haiti (“Sigora”) is a subsidiary of Sigora International (the “Sponsor”). Sigora constructed a microgrid in the communities of Môle Saint Nicolas, Jean Rabel, Bombardopolis and Presqu’ile, which has been operating since May 2017 and which consists of 1.25 megawatts (“MW”) of diesel capacity, 0.2MW of solar capacity, transmission and interconnection infrastructure, as well as smart meter har

Status
Under Construction
Sector
Solar, Residential, Power Generation (CCGT), Energy Storage, Commercial, Wind
Location
Haiti
Updated
22 Jul 2026
Source
Inter-American Development Bank (IADB)

ConstructChat

Ask ConstructChat about Sigora Haiti Microutility Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Sigora Haiti Microutility Project” is an infrastructure initiative in the Solar sector, located in Haiti. Taiyo aggregates data on it from Inter-American Development Bank (IADB).

Participants

Not available for this record.

Status

Original status

in implementation

Taiyo status

Under Construction

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Sigora Haiti (“Sigora”) is a subsidiary of Sigora International (the “Sponsor”). Sigora constructed a microgrid in the communities of Môle Saint Nicolas, Jean Rabel, Bombardopolis and Presqu’ile, which has been operating since May 2017 and which consists of 1.25 megawatts (“MW”) of diesel capacity, 0.2MW of solar capacity, transmission and interconnection infrastructure, as well as smart meter hardware to connect approximately 4,500 residential and commercial customers (the “Pilot Project”). Sigora sells energy to residential customers on a pre-paid basis through independent vendors that collect cash payments from individuals and then transfer funds to the Company via an electronic transfer system. Commercial customers sign one-year PPAs with Sigora providing for the purchase of electricity at a fixed rate in US$/kWh consumed.Sigora intends to expand the Pilot Project by adding wind power and battery capacity, interconnecting the municipalities of Môle Saint Nicolas, Jean Rabel and Bombardopolis, and expanding the grid to reach the municipality of Mare Rouge to provide 24-7 electricity service for a total of 6,600 commercial and residential connections in the Northwest of Haiti (“Cluster 1”). In addition, Sigora plans to build a second, independent, microgrid approximately 200 km south of Cluster 1 in the municipalities of Liancourt, Petite Rivière de l’Artibonite and Dessalines (“Cluster 2”). Cluster 2 will consist of diesel and solar generation combined with battery technology and will allow Sigora to add 15,000 connections. Ultimately, the Project will supply electricity to approximately 21,600 connections, or 110,000 individuals, in eight municipalities. Together the Cluster 1 activities and Cluster 2 activities are the “Project”.IDB Invest is currently considering providing an up to US$3.0 million senior loan and mobilizing up to US$7.0 million in subordinated financing from the Clean Technology Fund to support the Project.

Original sector

Energy

Budget

Location

Country

Haiti

Source

Source

Inter-American Development Bank (IADB)

URL

More Details

Record type

Project

Sector

Solar, Residential, Power Generation (CCGT), Energy Storage, Commercial, Wind

Article published date

2025-12-12

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project