Sihanoukville International Airport

Sector: Airport • Location: Preah Seihanu, Cambodia

Source: World Bank Group

Project
Active

In July 2006, Societe Concessionnaire des Aeroports (SCA) signed a 35 year concession to rehabilitate, expand and manage Sihanoukville International Airport in Sihanoukville, Cambodia. SCA was expected to complete the project in two phases which was estimated to cost SCA US$250 million over the lifetime of the project in two phases.

SCA was a Cambodia-based joint venture between France’s Vinci

Status
Prospective
Sector
Airport, Aerospace & Defense, Commercial, Government
Location
Preah Seihanu, Cambodia
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about Sihanoukville International Airport

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Sihanoukville International Airport” is an infrastructure initiative in the Airport sector, located in Preah Seihanu, Cambodia. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Company

Status

Original status

Active

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

In July 2006, Societe Concessionnaire des Aeroports (SCA) signed a 35 year concession to rehabilitate, expand and manage Sihanoukville International Airport in Sihanoukville, Cambodia. SCA was expected to complete the project in two phases which was estimated to cost SCA US$250 million over the lifetime of the project in two phases. SCA was a Cambodia-based joint venture between France’s Vinci SA (holding 70-percent) and Malaysia’s Muhibbah Engineering (holding 30-percent). SCA completed the $8 million renovation of the airport as phase one of the project in January 2007, when it finished all tasks required to reopen the airport. The second phase involved the lengthening of the runway from 1.8km to 2.2km and the construction of a new terminal. The second phase was expected to cost $100 million and be completed by 2014. SCA expected the airport to serve two million passengers annually, after completion of all work on the airport. Total project cost was $40.1 million until 2010 included Terminal Expansion at SRIA (2006) for $6.4 million (15.9%), Capital Expenditure at SIA in 2006-07 for US$ $9.7 million (24.2%), and runway investment at SIA in 2008-10 for $24.0 million (59.9%). Such investment program consisted of the mandatory capital investments required under the concession for SIA for 2006 and 2007; the terminal capacity increase at SRIA to provide service to the increasing passenger growth; and the capital investments required at SIA in 2008-10, should traffic at the airport increase in accordance with the company’s projections. The project company secured $35 million in funding from IFC (US$17.5 million)and French Proparco (US$17.5 milion). The IFC provided SCA with a $7.5 million loan, as well as upto $10 million in stand-by funding. SCA was previously awarded a concession for two other Cambodia airports – Phnom Penh Airport, and Siem Reap Airport. Both concessions were extended by 20 years shortly before SCA won the Sihanoukville concession. As of June 2007, the airport was operational.

Original sector

Transport

Procurement method

Budget

Location

Country

Cambodia

State

Preah Seihanu

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Airport, Aerospace & Defense, Commercial, Government

Article published date

2024-05-21

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project