logo

SIKASSO- KORHOGO-BOBO-DIOULASSO (SKBO) BASIN OF INTEGRATION PROJECT

Sector: Mass Transit • Location: Burkina Faso

Source: World Bank

Project
Active

The proposed project aims to provide climate-resilient transport connectivity in the project regions along Burkina Faso’s SKBo region, financing the RN11 and railway adaptation to climate change, enhancing climate resilience in selected rural road sections, and strengthening the Government of Burkina Faso’s institutional capacity in the road transport sector with consideration of climate change, r

Project Information FAQ

Project Information

5 Q
The project “SIKASSO- KORHOGO-BOBO-DIOULASSO (SKBO) BASIN OF INTEGRATION PROJECT” is an infrastructure initiative in the Mass Transit sector, located in Burkina Faso. Taiyo aggregates data on it from World Bank.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

active

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The proposed project aims to provide climate-resilient transport connectivity in the project regions along Burkina Faso’s SKBo region, financing the RN11 and railway adaptation to climate change, enhancing climate resilience in selected rural road sections, and strengthening the Government of Burkina Faso’s institutional capacity in the road transport sector with consideration of climate change, road safety, road asset management, citizen engagement, and gender considerations. The proposed Project builds on lessons learned and results from previous Bank-financed transport projects, including previous experience in Burkina Faso tackling connectivity issues, climate change challenges, and engaging citizens in a fragile environment. It includes four components: Component 1: Resilient multimodal connectivity. This component will finance associated works, services, and goods for the following sub-components: • Subcomponent 1.1: Corridor Improvement: RN11 Banfora - Sideradougou - Ouo (115 km). This component will finance civils works to upgrade the connectivity between Banfora and Ouo through the rehabilitation of 115 km on the RN11 (Banfora - Sideradougou - Ouo road). • Subcomponent 1.2: Resilient upgrade of the selected sections of the Ouagadougou - PK frontier-CI railway - (60 km): This sub-component will finance critical rehabilitation works over 60 km on the Burkinabe section, of the existing Ouagadougou-Bobo-Dioulasso-PK frontier-Cote d'Ivoire railway infrastructure. Component 2: Climate-Resilient Rural Accessibility and Logistics. This component will finance reconstruction and improvement of 150 to 200 km of rural roads along these highways, providing rural communities with climate-resilient access to basic services and improving connectivity between agricultural hubs/production areas and markets. The component will also finance the procurement, construction and/or rehabilitation of small agricultural logistics facilities along the project roads, inter alia, solar-powered mango cold storage facilities, milk collection centers, as well as Pilot Processing Units.Component 3: Project Management and Monitoring Support. This component will finance the project's operating costs and monitoring and evaluation activities. Component 4: Contingent Emergency Response Component (CERC). A CERC is included in the project in accordance with Investment Project Financing (IPF) Policy, paragraphs 12 and 13, for Situations of Urgent Need of Assistance and Capacity Constraints. This will allow for rapid reallocation of credit uncommitted funds in the event of an eligible emergency. To meet CERC activation requirements, the Government will prepare a CERC Manual, submit an Emergency Action Plan (EAP), and meet the E&S requirements agreed in the EAP and ESCP.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data