logo
ProjectApproved

Sikkim Integrated Urban Development Project

Sector: Water Supply and Storage • Location: India

Source: Asian Development Bank (ADB)

The project will (i) improve sustainable, inclusive, and resilient urban services and mobility through infrastructure investment; and (ii) build the state's capacity for integrated urban planning and sustainable service delivery. Based on a gap analysis undertaken by the Urban Development Department (UDD) and Public Health Engineering Department (PHED), seven towns are prioritized for the proposed

Status
Prospective
Sector
Water Supply and Storage, Automotive, Car parking, Residential, Hotel, Road, Government, Commercial
Location
India
Updated
22 Jul 2026
Source
Asian Development Bank (ADB)

ConstructChat

Ask ConstructChat about Sikkim Integrated Urban Development Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Sikkim Integrated Urban Development Project” is an infrastructure initiative in the Water Supply and Storage sector, located in India. Taiyo aggregates data on it from Asian Development Bank (ADB).

Participants

Sponsoring Agency

Status

Original status

approved

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The project will (i) improve sustainable, inclusive, and resilient urban services and mobility through infrastructure investment; and (ii) build the state's capacity for integrated urban planning and sustainable service delivery. Based on a gap analysis undertaken by the Urban Development Department (UDD) and Public Health Engineering Department (PHED), seven towns are prioritized for the proposed urban infrastructure investment (i.e., Gangtok, Gyalshing, Mangan, Pakyong, Rangpo, Singtam, and Soreng towns). The project aims to strengthen climate-resilient and smart water and sanitation infrastructure by improving water supply systems in Gangtok, Pakyong, Rangpo, and Singtam, focusing on reducing nonrevenue water and ensuring continuous supply. Sanitation infrastructure enhancements will include sewerage networks in core areas along with fecal sludge management for the remaining areas of Pakyong, Rangpo, Singtam, and Soreng, and inundation control in critically affected areas across all the seven project towns.Urban mobility will be improved by (i) upgrading roads; (ii) establishing road asset management system; (iii) improving stormwater drains, footpaths, and streetlights; and (iv) establishing transit hubs with gender equality and social inclusion (GESI) responsive community facilities and smart parking. The development of smart zones with smart street lighting and air pollution monitoring systems will further enhance urban livability. A riverfront development with a park and community hall is planned in Rangpo to enhance recreational public space.Municipal service capacity will be enhanced through integrated urban planning initiatives, including updates to the State Strategic Urban Plan and the development of geographic information system (GIS)-based master plans. Efforts will include capacity building for the State Climate Change Cell and the preparation of town-level climate action plans. Sustainable O&M plans will be developed along with modernizing accounting and tax revenue systems. Inclusive governance measures will include citizen-centric e-governance programs and the establishment of a State Urban Gender Cell. Skills development and awareness activities will include training for government officials, municipal staff, and local communities including school children, public representatives, and citizens on urban essential services and road safety.Implementation arrangements. UDD of the Government of Sikkim will be the executing and implementing agency, with support from two project implementation units (PIUs). One PIU will consist of officers from UDD, while the other will comprise officers from PHED. PHED-PIU will manage water supply and sewerage components at the town level whereas UDD-PIU will oversee other project components. Both PIUs will have town-level field offices. PHED and UDD have prior experience in implementing similar projects.

Original sector

Water and other urban infrastructure and services

Budget

Location

Country

India

Source

Source

Asian Development Bank (ADB)

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Automotive, Car parking, Residential, Hotel, Road, Government, Commercial

Article published date

2025-09-23

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project