logo

Sikkim Integrated Urban Development Project

Sector: Water Supply and Storage • Location: India

Source: Asian Development Bank (ADB)

Project
Approved

The project will (i) improve sustainable, inclusive, and resilient urban services and mobility through infrastructure investment; and (ii) build the state's capacity for integrated urban planning and sustainable service delivery. Based on a gap analysis undertaken by the Urban Development Department (UDD) and Public Health Engineering Department (PHED), seven towns are prioritized for the proposed

Project Information FAQ

Project Information

5 Q
The project “Sikkim Integrated Urban Development Project” is an infrastructure initiative in the Water Supply and Storage sector, located in India. Taiyo aggregates data on it from Asian Development Bank (ADB).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

approved

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The project will (i) improve sustainable, inclusive, and resilient urban services and mobility through infrastructure investment; and (ii) build the state's capacity for integrated urban planning and sustainable service delivery. Based on a gap analysis undertaken by the Urban Development Department (UDD) and Public Health Engineering Department (PHED), seven towns are prioritized for the proposed urban infrastructure investment (i.e., Gangtok, Gyalshing, Mangan, Pakyong, Rangpo, Singtam, and Soreng towns). The project aims to strengthen climate-resilient and smart water and sanitation infrastructure by improving water supply systems in Gangtok, Pakyong, Rangpo, and Singtam, focusing on reducing nonrevenue water and ensuring continuous supply. Sanitation infrastructure enhancements will include sewerage networks in core areas along with fecal sludge management for the remaining areas of Pakyong, Rangpo, Singtam, and Soreng, and inundation control in critically affected areas across all the seven project towns.Urban mobility will be improved by (i) upgrading roads; (ii) establishing road asset management system; (iii) improving stormwater drains, footpaths, and streetlights; and (iv) establishing transit hubs with gender equality and social inclusion (GESI) responsive community facilities and smart parking. The development of smart zones with smart street lighting and air pollution monitoring systems will further enhance urban livability. A riverfront development with a park and community hall is planned in Rangpo to enhance recreational public space.Municipal service capacity will be enhanced through integrated urban planning initiatives, including updates to the State Strategic Urban Plan and the development of geographic information system (GIS)-based master plans. Efforts will include capacity building for the State Climate Change Cell and the preparation of town-level climate action plans. Sustainable O&M plans will be developed along with modernizing accounting and tax revenue systems. Inclusive governance measures will include citizen-centric e-governance programs and the establishment of a State Urban Gender Cell. Skills development and awareness activities will include training for government officials, municipal staff, and local communities including school children, public representatives, and citizens on urban essential services and road safety.Implementation arrangements. UDD of the Government of Sikkim will be the executing and implementing agency, with support from two project implementation units (PIUs). One PIU will consist of officers from UDD, while the other will comprise officers from PHED. PHED-PIU will manage water supply and sewerage components at the town level whereas UDD-PIU will oversee other project components. Both PIUs will have town-level field offices. PHED and UDD have prior experience in implementing similar projects.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data