Sila Detention Phase 2
Sector: Water Supply and Storage • Location: Houston, Texas, United States of America
Source: Dodge USA
Construction of Sila Detention Phase 2, Harris County, Texas. Scope of Project: Site Preparation, Heavy Site Preparation, Detention Basin Excavation, On-Site Spoil Disposal, Drainage Swales, (2) Junction Boxes, and Outfall 210,700 CY of Detention Basin Excavation, and Spoil Disposal 438 SY Concrete Slope Paving and 336 SY Concrete Rip-Rap 1,819 LF of 24-inch to 54-inch RCP and all appurtenances 10
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | closed |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | Construction of Sila Detention Phase 2, Harris County, Texas. Scope of Project: Site Preparation, Heavy Site Preparation, Detention Basin Excavation, On-Site Spoil Disposal, Drainage Swales, (2) Junction Boxes, and Outfall 210,700 CY of Detention Basin Excavation, and Spoil Disposal 438 SY Concrete Slope Paving and 336 SY Concrete Rip-Rap 1,819 LF of 24-inch to 54-inch RCP and all appurtenances 104 LF of 6'x4' RCB and all appurtenances Stormwater Pollution Control |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
More Water Supply and Storage projects in United States of America
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
- KITCEHN REMODEL, REPLACE CABINETS, WATER AND WASTE LINES REDIRECTED, NEW ELECTRICAL LINES FROM MAIN PANEL
- LAFCO PROCESS FOR NEW WATER CONNECTION ON COH WATER SERVICE
- BUILDING (A): MANUFACTURING/MANUFACTURING SUPPORT SPACE, BOILER REPLACE, WATER PURIFICATION SYSTEM, HVAC, 652 SF MAIN
