Silex Track Improvements
The status, timeline and source of this project. A free account opens every field.
Source: Dodge
Construction of atractor pull track. Scope is to include equipment, labor and dirtfor construction of track as wellas grading of top soil replacedwith red clay. There will be atminimum 300 to 350 feet of trackfor pulling with additional spacefor sled and pull off area as wellas a safety berm at the end ofthe track and ditches filled
- Status
- Closed
- Sector
- Government, Commercial, Car parking, Automotive, Manufacturing (Industrial)
- Location
- Silex, Missouri, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Silex Track Improvements
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | bid results |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Construction of atractor pull track. Scope is to include equipment, labor and dirtfor construction of track as wellas grading of top soil replacedwith red clay. There will be atminimum 300 to 350 feet of trackfor pulling with additional spacefor sled and pull off area as wellas a safety berm at the end ofthe track and ditches filled |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Missouri |
City | Silex |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Government, Commercial, Car parking, Automotive, Manufacturing (Industrial) |
Article published date | 2025-09-22 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
