logo

Silver Run-Cedar Creek 230 kV Substation Upgrade

Sector: Power Generation (CCGT) • Location: United States

Source: T&D World

Project
Designated Entity Correction

Correction of Designated Entity assignment for the baseline project to replace three jumpers and one air disconnect switch at the Silver Run 230 kV substation in the DPL zone; the correct entity is LS Power.

Status
Prospective
Sector
Power Generation (CCGT)
Location
United States of America
Updated
22 Jul 2026
Source
T&D World

ConstructChat

Ask ConstructChat about Silver Run-Cedar Creek 230 kV Substation Upgrade

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “Silver Run-Cedar Creek 230 kV Substation Upgrade” is an infrastructure initiative in the Power Generation (CCGT) sector, located in United States. Taiyo aggregates data on it from T&D World.

Participants

Not available for this record.

Status

Original status

designated entity correction

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Correction of Designated Entity assignment for the baseline project to replace three jumpers and one air disconnect switch at the Silver Run 230 kV substation in the DPL zone; the correct entity is LS Power.

Original sector

Electric Power Transmission

Location

Country

United States of America (USA)

Source

Source

T&D World

URL

More Details

Record type

Project

Sector

Power Generation (CCGT)

Article published date

2025-09-16

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project