Silver Star Road Multi-Use Path Phase 1
One of 10,000+ projects Taiyo tracks in British Columbia.
Source: Dodge USA
Construction of a new Multi-use path along Silver Star Road from the BX Fire Hall to Blackcomb Way including the realignment of Silver Star Road from East DeDecker Road to Duncan Road. Work includes associated drainage and street lighting. Work also includes Multi-use Path from Pleasant Valley Road approximately 350m east. 1. Installation of approximately 1.6km of 3.0m wide MUP. 2. Installation of
- Status
- Closed
- Sector
- Commercial, Water Supply and Storage, Road, Waste Processing and Treatment
- Location
- Vernon, British Columbia, Canada
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Silver Star Road Multi-Use Path Phase 1
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Construction of a new Multi-use path along Silver Star Road from the BX Fire Hall to Blackcomb Way including the realignment of Silver Star Road from East DeDecker Road to Duncan Road. Work includes associated drainage and street lighting. Work also includes Multi-use Path from Pleasant Valley Road approximately 350m east. 1. Installation of approximately 1.6km of 3.0m wide MUP. 2. Installation of approximately 800m of various size storm pipe and culverts 3. Approximately 6800m2 of road recon... |
Procurement method | |
Budget |
Location
Country | Canada |
State | British Columbia |
City | Vernon |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Commercial, Water Supply and Storage, Road, Waste Processing and Treatment |
Article published date | 2024-02-22 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Commercial projects in Canada
- Site C Worker Accommodation
- Transport and Rescue Squadron Hangar Facility - 19 Wing CFB Comox 442
- Thornwood Residences Phase 2
- Canadian Tire Corporate Office Interior Renovation
- St. Stephen Border Crossing
- Aqsarniit Hotel and Convention Centre
- Safeway Refrigerated Warehouse
- International Brotherhood of Boilermakers Training Centre and Union Hall
