logo
ProjectClosed

Silver Star Road Multi-Use Path Phase 1

One of 10,000+ projects Taiyo tracks in British Columbia.

Source: Dodge USA

Construction of a new Multi-use path along Silver Star Road from the BX Fire Hall to Blackcomb Way including the realignment of Silver Star Road from East DeDecker Road to Duncan Road. Work includes associated drainage and street lighting. Work also includes Multi-use Path from Pleasant Valley Road approximately 350m east. 1. Installation of approximately 1.6km of 3.0m wide MUP. 2. Installation of

Status
Closed
Sector
Commercial, Water Supply and Storage, Road, Waste Processing and Treatment
Location
Vernon, British Columbia, Canada
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about Silver Star Road Multi-Use Path Phase 1

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Silver Star Road Multi-Use Path Phase 1” is an infrastructure initiative in the Commercial sector, located in Vernon, British Columbia, Canada. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Construction of a new Multi-use path along Silver Star Road from the BX Fire Hall to Blackcomb Way including the realignment of Silver Star Road from East DeDecker Road to Duncan Road. Work includes associated drainage and street lighting. Work also includes Multi-use Path from Pleasant Valley Road approximately 350m east. 1. Installation of approximately 1.6km of 3.0m wide MUP. 2. Installation of approximately 800m of various size storm pipe and culverts 3. Approximately 6800m2 of road recon...

Procurement method

Budget

Location

Country

Canada

State

British Columbia

City

Vernon

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Commercial, Water Supply and Storage, Road, Waste Processing and Treatment

Article published date

2024-02-22

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project