Silverado High School Comprehensive Modernization
One of 10,000+ projects Taiyo tracks in Nevada.
Source: Dodge USA
The Comprehensive Modernization of Silverado High School includes the replacement of the concrete slab on grade plaza sections, replacing the sealant at vertical masonry control joints and sealant around doors and windows; repainting the underside of metal canopies and all metal railing and entry gates; repainting the existing smooth CMU exterior walls, refinish EIFS panels, new access ladders on
- Status
- Closed
- Sector
- Metal, Cement, Rail, Government, Commercial
- Location
- Las Vegas, Nevada, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Silverado High School Comprehensive Modernization
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Comprehensive Modernization of Silverado High School includes the replacement of the concrete slab on grade plaza sections, replacing the sealant at vertical masonry control joints and sealant around doors and windows; repainting the underside of metal canopies and all metal railing and entry gates; repainting the existing smooth CMU exterior walls, refinish EIFS panels, new access ladders on the roof, new 80 mil single-ply roofing overlay and replacement of Kalwal skylights; the repair a... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Nevada |
City | Las Vegas |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Metal, Cement, Rail, Government, Commercial |
Article published date | 2024-03-18 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Metal projects in United States of America
- STRUCTURAL STEEL FABRICATION AND ERECTION
- SR 7; SR 91 & SR 520 @ 4 LOCS - BRIDGE PRESERVATION
- SR 83 @ SHOAL CREEK
- Annenberg Science Complex - James M. Rosser Hall [027B-ASCR]
- ADD NEW PRE-FAB STEEL GARAGE 780SQ FT SHARES PLANS WITH 202104289 & 202104326
- NEW 3200 SF PREFAB METAL BUILDING CONSISTING OF A CUSTOMER INTERFACE, OFFICES, RESTROOM/BREAK ROOM, DISASSEMBLY & STOR.
- PHASED APPROVAL FOR 1) METAL FRAMING & SHEETROCK & 2) 3 UNDE R SLAB DRAINS. REFER TO MAIN PERMIT 202205223
- REPLACE DAMAGED STEEL COLUMN
