Simi Valley Bus Stop Improvements
Sector: Metal • Location: Simi Valley, California, United States of America
Source: Dodge USA
Scope of work : Traffic control, Construction Signing and Traffic Maintenance; Construct 6 PCC Curb per SSPWC Std. Plans 120-3; Furnish and Install Trash Receptacle Powder Coated (Forest Green); Relocation and Installation of Existing Bus Shelter : 1) removal and salvaging of 23 concrete benches; 2) 2 tree removals; 3) installation of 9 bus shelters, 23 six foot iron benches, and 14 trash receptac
- Status
- Closed
- Sector
- Metal, Commercial, Cement, Government, Car parking, Automotive, Steel, Manufacturing (Industrial)
- Location
- Simi Valley, California, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Simi Valley Bus Stop Improvements
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Scope of work : Traffic control, Construction Signing and Traffic Maintenance; Construct 6 PCC Curb per SSPWC Std. Plans 120-3; Furnish and Install Trash Receptacle Powder Coated (Forest Green); Relocation and Installation of Existing Bus Shelter : 1) removal and salvaging of 23 concrete benches; 2) 2 tree removals; 3) installation of 9 bus shelters, 23 six foot iron benches, and 14 trash receptacles, all powder coated in Forest Green; 4) construction of 476 square feet of sidewalk; 5) constr... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | California |
City | Simi Valley |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Metal, Commercial, Cement, Government, Car parking, Automotive, Steel, Manufacturing (Industrial) |
Article published date | 2024-11-04 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Metal projects in United States of America
- STRUCTURAL STEEL FABRICATION AND ERECTION
- SR 7; SR 91 & SR 520 @ 4 LOCS - BRIDGE PRESERVATION
- SR 83 @ SHOAL CREEK
- Annenberg Science Complex - James M. Rosser Hall [027B-ASCR]
- ADD NEW PRE-FAB STEEL GARAGE 780SQ FT SHARES PLANS WITH 202104289 & 202104326
- NEW 3200 SF PREFAB METAL BUILDING CONSISTING OF A CUSTOMER INTERFACE, OFFICES, RESTROOM/BREAK ROOM, DISASSEMBLY & STOR.
- PHASED APPROVAL FOR 1) METAL FRAMING & SHEETROCK & 2) 3 UNDE R SLAB DRAINS. REFER TO MAIN PERMIT 202205223
- REPLACE DAMAGED STEEL COLUMN
