SINALOA IRRIGATION
The status, timeline and source of this project. A free account opens every field.
Source: World Bank Group
Rio Sinaloa Irrigation Project consists of irrigation and drainage systems for 100,000 ha on both banks of the Sinaloa River in the State of Sinaloa. The project elements are summarized below: (a) dam and storage reservoir at the Bacurato site with minimum provision for adding hydroelectric power facilities in the future; (b) access road to the site and a camp to house construction and operating p
- Status
- Closed
- Sector
- Road, Water Supply and Storage, Power Generation (CCGT), Waste Processing and Treatment, Hydro, Cement, Raw Materials, Government
- Location
- Mexico
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about SINALOA IRRIGATION
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Rio Sinaloa Irrigation Project consists of irrigation and drainage systems for 100,000 ha on both banks of the Sinaloa River in the State of Sinaloa. The project elements are summarized below: (a) dam and storage reservoir at the Bacurato site with minimum provision for adding hydroelectric power facilities in the future; (b) access road to the site and a camp to house construction and operating personnel; (c) a diversion dam at the Sinaloa de Leyva site to divert water to main canals on each side of the river; (d) wells to augment surface water supply; (e) a concrete-lined irrigation distribution system of main canals, laterals, and sublaterals and devices to measure water delivery; (f) a complete drainage system of main and secondary drains; (g) roads along canals and drains for operation and maintenance and for use by farmers; (h) houses for ditch riders, a telephone network, gauging stations and project facilities to serve as operating headquarters; (i) land clearing and leveling; and, (j) intensive extension service during initial period of project. This report comprises two impact evaluation reports for Mexico an Morocco, and an overview which synthesizes the findings of both impact evaluations regarding the extent of, and reasons for, sustainability a compares the impact of irrigation systems design on project performanc striking feature of all four projects is the lower agricultural and ec performance than that estimated at the time of audit. Weaker commodity an inadequate development approach in one project, lower than expected efficiencies, insufficient attention to operation and maintenance in a projects, and damage to the environment and natural resources have bee main factors affecting performance. However, with one exception, which performed poorly, the degree of success in the transfer of technology respect of both irrigation practice and agricultural productivity has continued to be sustained in the other three projects. |
Original sector | Agriculture, Fishing and Forestry |
Location
Country | Mexico |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Road, Water Supply and Storage, Power Generation (CCGT), Waste Processing and Treatment, Hydro, Cement, Raw Materials, Government |
Article published date | 2025-12-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Road projects in Mexico
- Norte III Combined Cycle Power Plant Chihuahua
- Libramiento de Ciudad Obregon
- Autovia Urbana Norte
- Tuxtla Gutierrez - San Cristobal de las Casas Highway Expansion
- Coatzacoalcos-Villahermosa Highway
- Viaducto Bicentenario (Phase 1)
- La Piedad Bypass and Access to Mexico-Gudalajara Highway
- Rio de los Remedios-Ecatepec urban toll road (Phase I)
