SINGAPORE POWER II
One of 3,222 projects Taiyo tracks in Singapore.
Source: World Bank Group
The project forms the second and final stage of the Pasir Panjang B Thermal Station, and consists of two 60 MW turbo-alternator sets and two boilers. This will double the capacity of the first stage financed by the bank in 1963. Electricity sales in Singapore have risen at an average rate of 9.6 percent per year over the past five years, and this rate is expected to rise to 15 percent per year bet
- Status
- Closed
- Sector
- Power Generation (CCGT), Manufacturing (Industrial), Geothermal, Government
- Location
- Singapore
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about SINGAPORE POWER II
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project forms the second and final stage of the Pasir Panjang B Thermal Station, and consists of two 60 MW turbo-alternator sets and two boilers. This will double the capacity of the first stage financed by the bank in 1963. Electricity sales in Singapore have risen at an average rate of 9.6 percent per year over the past five years, and this rate is expected to rise to 15 percent per year between 1966 and 1970 due mainly to a big increase in sales to large industrial consumers. The Electricity Department plans a further expansion program between 1966 and 1970 which will add a further 300 MW to the installed capacity in addition to the 120 MW provided in the present project. It will also provide the necessary transmission and distribution capacity. The program is well designed to meet the increase in demand. |
Original sector | (Historic)Electric Power & Other Energy |
Location
Country | Singapore |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Manufacturing (Industrial), Geothermal, Government |
Article published date | 2025-12-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Power Generation (CCGT) projects in Singapore
- Jurong Rock Cavern Phase 1 - Stage 2
- Khoo Teck Puat Hospital
- Phoenix Solar Thin Film Photovoltaic Plant
- UWCSEA Solar Thermal Energy Plant
- Jurong Island CCGT Plant
- North-South Transmission Cable Tunnel Contract NS3
- Pulau Seraya Combined Cycle Power Plant Block III
- Pulau Seraya Combined Cycle Power Plant Block IV
