SINGAPORE POWER III
Sector: Water Supply and Storage • Location: Singapore
Source: World Bank Group
The electric power distribution part of the project consists of the expansion of the distribution system during the two-year period 1967-68 and includes the installation of 230 MVA of primary and 250 MVA of secondary distribution transformers, 145 miles of primary distribution cable and secondary distribution equipment. The water supply part of the project includes the construction of a new Seleta
- Status
- Closed
- Sector
- Water Supply and Storage, Power Generation (CCGT), Hydro, Government
- Location
- Singapore
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about SINGAPORE POWER III
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The electric power distribution part of the project consists of the expansion of the distribution system during the two-year period 1967-68 and includes the installation of 230 MVA of primary and 250 MVA of secondary distribution transformers, 145 miles of primary distribution cable and secondary distribution equipment. The water supply part of the project includes the construction of a new Seletar dam and reservoir, expansion of the Woodleigh Treatment Plant and extension of the water distribution system through 1970. Total cost is estimated at $16 million and the proposed loan will cover the presently estimated foreign exchange cost of $8 million or half of the estimated total cost. |
Original sector | (Historic)Electric Power & Other Energy |
Location
Country | Singapore |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Power Generation (CCGT), Hydro, Government |
Article published date | 2025-12-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
