Single Span PPCDB Bridge Removal & Construction
Closed · Illinois · Last reported Jul 2025
Source: Dodge
Construction of a single span PPCDB bridge, removal of the existing 10'x7'x20' concrete box culvert, reconstructing 233 feet of roadway embankment, placing riprap for erosion control and miscellaneous items. Jordan Creek Road, 3.5 mile NE of Benton, NE1/4, NE1/4, S3, T6S, R3E, of the Third Principal Meridian
- Status
- Closed
- Sector
- Water Supply and Storage, Road, Cement, Waste Processing and Treatment, Bridge, Commercial
- Location
- Benton, Illinois, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Single Span PPCDB Bridge Removal & Construction
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Construction of a single span PPCDB bridge, removal of the existing 10'x7'x20' concrete box culvert, reconstructing 233 feet of roadway embankment, placing riprap for erosion control and miscellaneous items. Jordan Creek Road, 3.5 mile NE of Benton, NE1/4, NE1/4, S3, T6S, R3E, of the Third Principal Meridian |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Illinois |
City | Benton |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Road, Cement, Waste Processing and Treatment, Bridge, Commercial |
Article published date | 2025-07-28 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
